IAC logo
IAC Assessment: OK0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Metal Cutting Band Saw
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $5,000,000-$10,000,000
# of Employees 310
Plant Area (Sq.Ft.) 140,000
Annual Production 720 Pieces
Production Hrs. Annual 6,552
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,145 2,351,700 kWh $0.02
Electricity Demand $58,501 - kW-months/year -
Natural Gas $20,966 5,039 MMBtu $4.16
TOTAL ENERGY COSTS $114,452
RECOMMENDED SAVINGS* $263,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,870
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,935
Cost:
$800
$9,364 520,223 $571 713 - - - - - - $9,364
520,223
kWh
$571
713
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,177
Cost:
$13,490
- - - - $8,177 585 - - - - -
-
kWh
-
-
kW-months/year
$8,177
585
MMBtu
-
-
lb
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$3,419
Cost:
$2,000
$1,041 57,737 $2,378 247 - - - - - - $1,041
57,737
kWh
$2,378
247
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 4.446 AUTOMATE FINISHING PROCESS Savings:
$137,280
Cost:
$200,000
- - - - - - - - $137,280 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$137,280
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,339
Cost:
$860
$2,098 33,705 $2,053 213 $(-812) (-283) - - - - $2,098
33,705
kWh
$2,053
213
kW-months/year
$(-812)
(-283)
MMBtu
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,028
Cost:
-
- - - - - - $1,028 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,028
-
lb
-
-
$
07: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$81,900
Cost:
$11,250
- - - - - - - - $81,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$81,900
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,512
Cost:
$561
$5,556 235,346 $4,956 368 - - - - - - $5,556
235,346
kWh
$4,956
368
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$8,320
Cost:
-
- - - - - - - - $8,320 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$8,320
-
$
TOTAL RECOMMENDED Savings:
$263,910
Cost:
$228,961
$18,059 847,011 $9,958 1,541 $7,365 302 $1,028 - $227,500 - $18,059
847,011
kWh
$9,958
1,541
kW-months/year
$7,365
302
MMBtu
$1,028
-
lb
$227,500
-
$
TOTAL IMPLEMENTED Savings:
$24,870
Cost:
$17,150
$12,503 611,665 $5,002 1,173 $7,365 302 - - - - $12,503
611,665
kWh
$5,002
1,173
kW-months/year
$7,365
302
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes