IAC Assessment: OK0597
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0597
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Steel tools
NAICS n/a
SIC 3490 -
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 50,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 5,070
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,660 1,136,870 kWh $0.03
Electricity Demand $36,413 - kW-months/year -
Electricity Fees $4,314 - $ -
Natural Gas $7,116 1,774 MMBtu $4.01
TOTAL ENERGY COSTS $85,203
RECOMMENDED SAVINGS* $32,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,212
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,212
Cost:
$19,769
$4,052 136,870 $2,907 324 - - - - $253 - $4,052
136,870
kWh
$2,907
324
kW-months/year
-
-
$
-
-
$
$253
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$794
Cost:
$176
$462 15,533 $332 37 - - - - - - $462
15,533
kWh
$332
37
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,790
Cost:
$1,500
- - - - - - $2,790 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,790
-
$
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,995
Cost:
$4,000
$2,995 101,114 - - - - - - - - $2,995
101,114
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$19,012
Cost:
$2,700
- - - - $19,012 - - - - - -
-
kWh
-
-
kW-months/year
$19,012
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,803
Cost:
$28,145
$7,509 253,517 $3,239 361 $19,012 - $2,790 - $253 - $7,509
253,517
kWh
$3,239
361
kW-months/year
$19,012
-
$
$2,790
-
$
$253
-
$
TOTAL IMPLEMENTED Savings:
$7,212
Cost:
$19,769
$4,052 136,870 $2,907 324 - - - - $253 - $4,052
136,870
kWh
$2,907
324
kW-months/year
-
-
$
-
-
$
$253
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost