Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2000 |
Principal Product | Vinyl flooring |
NAICS | n/a |
SIC | 3996 - Hard Surface Floor Coverings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 435,000 |
Annual Production | 42,000,000 Thousand Feet |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $902,876 | 24,038,394 | kWh | $0.04 |
Electricity Fees | $3,538 | - | $ | - |
Natural Gas | $571,959 | 226,827 | MMBtu | $2.52 |
TOTAL ENERGY COSTS | $2,081,873 | |||
RECOMMENDED SAVINGS* | $413,796 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,151 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $15,151 Cost: $14,545 |
$15,151 | 402,989 | - | - | - | - | - | - |
$15,151 402,989 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $2,001 Cost: $10,500 |
- | - | $2,001 | 735 | - | - | - | - |
- - kWh |
$2,001 735 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $26,183 Cost: $35,000 |
$26,183 | 696,366 | - | - | - | - | - | - |
$26,183 696,366 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7145 INSTALL SKYLIGHTS |
Savings: $9,262 Cost: $5,460 |
$9,262 | 246,483 | - | - | - | - | - | - |
$9,262 246,483 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $276 Cost: $1,620 |
$276 | 7,327 | - | - | - | - | - | - |
$276 7,327 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $229,950 Cost: $32,400 |
- | - | - | - | - | - | $229,950 | - |
- - kWh |
- - MMBtu |
- - lb |
$229,950 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $122,640 Cost: $200,000 |
- | - | - | - | - | - | $122,640 | - |
- - kWh |
- - MMBtu |
- - lb |
$122,640 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $8,333 Cost: - |
- | - | - | - | $8,333 | 40,000 | - | - |
- - kWh |
- - MMBtu |
$8,333 40,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $413,796 Cost: $299,525 |
$50,872 | 1,353,165 | $2,001 | 735 | $8,333 | 40,000 | $352,590 | - | $50,872 1,353,165 kWh |
$2,001 735 MMBtu |
$8,333 40,000 lb |
$352,590 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,151 Cost: $14,545 |
$15,151 | 402,989 | - | - | - | - | - | - | $15,151 402,989 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes |