Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2000 |
Principal Product | Outdoor Furniture |
NAICS | n/a |
SIC | 2514 - Metal Household Furniture |
Sales | $5,000,000-$10,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 25,000 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $8,453 | 237,972 | kWh | $0.04 |
Electricity Fees | $1,223 | - | $ | - |
Natural Gas | $76,962 | 13,148 | MMBtu | $5.85 |
TOTAL ENERGY COSTS | $84,202 | |||
RECOMMENDED SAVINGS* | $122,442 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $96,463 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Primary Product | Increase in Production | Electricity Usage | Natural Gas | Personnel Changes | Primary Product | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $7,686 Cost: $4,275 |
- | - | $7,686 | 1,313 | - | - | - | - | - | - |
- - kWh |
$7,686 1,313 MMBtu |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,442 Cost: $1,900 |
$1,442 | 24,406 | - | - | - | - | - | - | - | - |
$1,442 24,406 kWh |
- - MMBtu |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $24,537 Cost: $26,122 |
- | - | - | - | - | - | - | - | $24,537 | - |
- - kWh |
- - MMBtu |
- - $ |
- - $ |
$24,537 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $18,577 Cost: $1,801 |
- | - | - | - | - | - | $18,577 | - | - | - |
- - kWh |
- - MMBtu |
- - $ |
$18,577 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $70,200 Cost: $47,500 |
- | - | - | - | $70,200 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$70,200 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $122,442 Cost: $81,598 |
$1,442 | 24,406 | $7,686 | 1,313 | $70,200 | - | $18,577 | - | $24,537 | - | $1,442 24,406 kWh |
$7,686 1,313 MMBtu |
$70,200 - $ |
$18,577 - $ |
$24,537 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $96,463 Cost: $53,576 |
- | - | $7,686 | 1,313 | $70,200 | - | $18,577 | - | - | - | - - kWh |
$7,686 1,313 MMBtu |
$70,200 - $ |
$18,577 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Primary Product | Increase in Production | Electricity Usage | Natural Gas | Personnel Changes | Primary Product | Increase in Production |