IAC logo
IAC Assessment: OK0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product metal components/ custom metal components
NAICS n/a
SIC 3324 - Steel Investment Foundries
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 30,000
Annual Production 3,500,000 Units
Production Hrs. Annual 5,840
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,941 1,904,400 kWh $0.03
Electricity Demand $46,229 - kW-months/year -
Electricity Fees $300 - $ -
Natural Gas $36,762 7,997 MMBtu $4.60
TOTAL ENERGY COSTS $374,439
RECOMMENDED SAVINGS* $61,503 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,003
#|Description Savings
Cost
Status Electricity Usage Increase in Production Electricity Usage Increase in Production
$ kWh $ %
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$59,500
Cost:
$115,187
- - $59,500 - -
-
kWh
$59,500
-
%
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$291
Cost:
$112
$291 8,400 - - $291
8,400
kWh
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$67
Cost:
$66
$67 1,926 - - $67
1,926
kWh
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$596
Cost:
$300
$596 17,236 - - $596
17,236
kWh
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,049
Cost:
-
$1,049 30,328 - - $1,049
30,328
kWh
-
-
%
TOTAL RECOMMENDED Savings:
$61,503
Cost:
$115,665
$2,003 57,890 $59,500 - $2,003
57,890
kWh
$59,500
-
%
TOTAL IMPLEMENTED Savings:
$2,003
Cost:
$478
$2,003 57,890 - - $2,003
57,890
kWh
-
-
%
Savings
Cost
$ kWh $ %
Electricity Usage Increase in Production Electricity Usage Increase in Production