IAC Assessment: OK0609
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0609
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Disposible device for hemodialysis Treatments
NAICS n/a
SIC 3841 - Surgical And Medical Instruments
Sales $1,000,000-$5,000,000
# of Employees 27
Plant Area (Sq.Ft.) 24,000
Annual Production 128,402 Pieces
Production Hrs. Annual 4,277
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,090 1,036,531 kWh $0.03
Natural Gas $15,797 3,280 MMBtu $4.82
TOTAL ENERGY COSTS $43,887
RECOMMENDED SAVINGS* $11,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,112
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$905
Cost:
$779
$799 10,171 - - $106 - $799
10,171
kWh
-
-
lb
$106
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,878
Cost:
$7,865
$4,887 98,495 - - $(-9) - $4,887
98,495
kWh
-
-
lb
$(-9)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,112
Cost:
-
$1,112 21,271 - - - - $1,112
21,271
kWh
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,212
Cost:
-
- - $4,212 421,200 - - -
-
kWh
$4,212
421,200
lb
-
-
$
TOTAL RECOMMENDED Savings:
$11,107
Cost:
$8,644
$6,798 129,937 $4,212 421,200 $97 - $6,798
129,937
kWh
$4,212
421,200
lb
$97
-
$
TOTAL IMPLEMENTED Savings:
$1,112
Cost:
-
$1,112 21,271 - - - - $1,112
21,271
kWh
-
-
lb
-
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Solid Waste (non-haz) Ancillary Material Cost