IAC logo
IAC Assessment: OK0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Tube Bending
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 71,000
Annual Production 0 Units
Production Hrs. Annual 2,990
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,010 1,369,578 kWh $0.05
Electricity Fees $1,429 - $ -
Natural Gas $19,252 4,106 MMBtu $4.69
TOTAL ENERGY COSTS $98,191
RECOMMENDED SAVINGS* $335,059 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$14,000
Cost:
$1,670
- - - - $14,000 2,400 - - - - -
-
kWh
-
-
kW-months/year
$14,000
2,400
MMBtu
-
-
gal
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,700
Cost:
$1,110
- - $4,700 90 - - - - - - -
-
kWh
$4,700
90
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,939
Cost:
$16,000
$1,188 21,996 $751 173 - - - - - - $1,188
21,996
kWh
$751
173
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$2,420
Cost:
$1,235
- - - - - - $2,420 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,420
-
gal
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$312,000
Cost:
$150,000
- - - - - - - - $312,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$312,000
-
$
TOTAL RECOMMENDED Savings:
$335,059
Cost:
$170,015
$1,188 21,996 $5,451 263 $14,000 2,400 $2,420 - $312,000 - $1,188
21,996
kWh
$5,451
263
kW-months/year
$14,000
2,400
MMBtu
$2,420
-
gal
$312,000
-
$
TOTAL IMPLEMENTED Savings:
$14,000
Cost:
$1,670
- - - - $14,000 2,400 - - - - -
-
kWh
-
-
kW-months/year
$14,000
2,400
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Primary Product