IAC logo
IAC Assessment: OK0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Aircraft Engine Internal Component Repair
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 235
Plant Area (Sq.Ft.) 65,000
Annual Production 150,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,624 8,487,400 kWh $0.02
Electricity Demand $216,758 37,160 kW-months/year $5.83
Electricity Fees $240 - $ -
Natural Gas $39,583 8,077 MMBtu $4.90
TOTAL ENERGY COSTS $472,425
RECOMMENDED SAVINGS* $20,094 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,794
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$147
Cost:
$126
- - - - $147 30 - - -
-
kWh
-
-
kW-months/year
$147
30
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,500
Cost:
$360
$3,500 141,828 - - - - - - $3,500
141,828
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,000
Cost:
$13,300
$5,550 225,304 $1,450 143 - - - - $5,550
225,304
kWh
$1,450
143
kW-months/year
-
-
MMBtu
-
-
$
04: 4.4260 MODIFY WORKLOAD Savings:
$147
Cost:
$70
$55 2,246 $36 4 - - $56 - $55
2,246
kWh
$36
4
kW-months/year
-
-
MMBtu
$56
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,100
Cost:
$5,800
- - $2,100 360 - - - - -
-
kWh
$2,100
360
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,000
Cost:
$290
$1,000 35,040 - - - - - - $1,000
35,040
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,200
Cost:
$5,734
$1,100 50,600 - - $5,100 1,038 - - $1,100
50,600
kWh
-
-
kW-months/year
$5,100
1,038
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,094
Cost:
$25,680
$11,205 455,018 $3,586 507 $5,247 1,068 $56 - $11,205
455,018
kWh
$3,586
507
kW-months/year
$5,247
1,068
MMBtu
$56
-
$
TOTAL IMPLEMENTED Savings:
$11,794
Cost:
$14,146
$10,105 404,418 $1,486 147 $147 30 $56 - $10,105
404,418
kWh
$1,486
147
kW-months/year
$147
30
MMBtu
$56
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes