IAC logo
IAC Assessment: OK0612
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0612
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Water & Oil Well Drilling Equipment
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 314,279
Annual Production 1,000 Pieces
Production Hrs. Annual 2,340
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,020 3,608,400 kWh $0.03
Electricity Fees $142,315 - $ -
Natural Gas $108,331 22,510 MMBtu $4.81
TOTAL ENERGY COSTS $343,491
RECOMMENDED SAVINGS* $108,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $90,113
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$88,000
Cost:
$17,542
- - - - $88,000 14,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
$88,000
14,000
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,333
Cost:
$577
$189 7,190 $307 37 - - - - $210 - - - $627 - $189
7,190
kWh
$307
37
kW-months/year
-
-
MMBtu
-
-
gal
$210
-
$
-
-
$
$627
-
$
03: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$2,772
Cost:
$5,200
- - - - - - $2,772 990 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,772
990
gal
-
-
$
-
-
$
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$463
Cost:
-
- - - - - - - - - - $463 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$463
-
$
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,650
Cost:
$720
$637 14,545 $1,013 123 - - - - - - - - - - $637
14,545
kWh
$1,013
123
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,115
Cost:
$5,150
- - $14,115 17,988 - - - - - - - - - - -
-
kWh
$14,115
17,988
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$108,333
Cost:
$29,189
$826 21,735 $15,435 18,148 $88,000 14,000 $2,772 990 $210 - $463 - $627 - $826
21,735
kWh
$15,435
18,148
kW-months/year
$88,000
14,000
MMBtu
$2,772
990
gal
$210
-
$
$463
-
$
$627
-
$
TOTAL IMPLEMENTED Savings:
$90,113
Cost:
$18,262
$637 14,545 $1,013 123 $88,000 14,000 - - - - $463 - - - $637
14,545
kWh
$1,013
123
kW-months/year
$88,000
14,000
MMBtu
-
-
gal
-
-
$
$463
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost