IAC logo
IAC Assessment: OK0613
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0613
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Water Proofing Membrane
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 15,120
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 3,650
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,011 1,682,082 kWh $0.04
Electricity Fees $40,760 - $ -
Natural Gas $25,865 10,336 MMBtu $2.50
TOTAL ENERGY COSTS $153,136
RECOMMENDED SAVINGS* $75,853 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,527
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$10,756
Cost:
$1,026
- - - - $10,756 1,769 - - - - -
-
kWh
-
-
kW-months/year
$10,756
1,769
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,071
Cost:
$4,000
- - - - $2,071 388 - - - - -
-
kWh
-
-
kW-months/year
$2,071
388
MMBtu
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$456
Cost:
$2,600
- - - - $456 75 - - - - -
-
kWh
-
-
kW-months/year
$456
75
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,475
Cost:
$7,120
- - - - $2,475 407 - - - - -
-
kWh
-
-
kW-months/year
$2,475
407
MMBtu
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,508
Cost:
$6,000
- - - - $3,508 577 - - - - -
-
kWh
-
-
kW-months/year
$3,508
577
MMBtu
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$54,883
Cost:
$20,680
$18,883 503,550 - - - - $36,000 - - - $18,883
503,550
kWh
-
-
kW-months/year
-
-
MMBtu
$36,000
-
$
-
-
$
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,400
Cost:
$572
$1,400 36,635 - - - - - - - - $1,400
36,635
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$304
Cost:
$125
$49 1,314 $215 2 - - $108 - $(-68) - $49
1,314
kWh
$215
2
kW-months/year
-
-
MMBtu
$108
-
$
$(-68)
-
$
TOTAL RECOMMENDED Savings:
$75,853
Cost:
$42,123
$20,332 541,499 $215 2 $19,266 3,216 $36,108 - $(-68) - $20,332
541,499
kWh
$215
2
kW-months/year
$19,266
3,216
MMBtu
$36,108
-
$
$(-68)
-
$
TOTAL IMPLEMENTED Savings:
$2,527
Cost:
$6,600
- - - - $2,527 463 - - - - -
-
kWh
-
-
kW-months/year
$2,527
463
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost