IAC logo
IAC Assessment: OK0614
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0614
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product HVAC equipment
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 330
Plant Area (Sq.Ft.) 150,000
Annual Production 2,000,000 Thousand Feet
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,536 5,206,400 kWh $0.03
Electricity Demand $95,764 17,345 kW-months/year $5.52
Electricity Fees $8,670 - $ -
Natural Gas $59,792 15,887 MMBtu $3.76
TOTAL ENERGY COSTS $360,824
RECOMMENDED SAVINGS* $24,958 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,756
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,325
Cost:
$335
- - $1,325 240 - - - - -
-
kWh
$1,325
240
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,500
Cost:
$6,100
$8,500 279,300 - - - - - - $8,500
279,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,656
Cost:
$9,700
$2,332 76,200 - - $3,324 1,035 - - $2,332
76,200
kWh
-
-
kW-months/year
$3,324
1,035
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$377
Cost:
$3,700
$377 12,305 - - - - - - $377
12,305
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$9,100
Cost:
$4,000
- - - - $3,800 1,170 $5,300 - -
-
kWh
-
-
kW-months/year
$3,800
1,170
MMBtu
$5,300
-
$
TOTAL RECOMMENDED Savings:
$24,958
Cost:
$23,835
$11,209 367,805 $1,325 240 $7,124 2,205 $5,300 - $11,209
367,805
kWh
$1,325
240
kW-months/year
$7,124
2,205
MMBtu
$5,300
-
$
TOTAL IMPLEMENTED Savings:
$14,756
Cost:
$13,700
$2,332 76,200 - - $7,124 2,205 $5,300 - $2,332
76,200
kWh
-
-
kW-months/year
$7,124
2,205
MMBtu
$5,300
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes