IAC logo
IAC Assessment: OK0615
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0615
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Dry Pet Food
NAICS n/a
SIC 2047 - Dog And Cat Food
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 100,000
Annual Production 146,000 Tons
Production Hrs. Annual 3,480
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $724,124 10,757,600 kWh $0.07
Natural Gas $858,665 132,189 MMBtu $6.50
TOTAL ENERGY COSTS $1,582,789
RECOMMENDED SAVINGS* $55,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,808
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,798
Cost:
$913
$270 8,322 $75 11 - - $825 - $628 - $270
8,322
kWh
$75
11
kW-months/year
-
-
MMBtu
$825
-
$
$628
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,895
Cost:
$5,476
$1,480 45,552 $415 62 - - - - - - $1,480
45,552
kWh
$415
62
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,844
Cost:
$585
$1,844 56,858 - - - - - - - - $1,844
56,858
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,788
Cost:
$250
- - - - $3,788 855 - - - - -
-
kWh
-
-
kW-months/year
$3,788
855
MMBtu
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,147
Cost:
$238
- - - - $1,147 259 - - - - -
-
kWh
-
-
kW-months/year
$1,147
259
MMBtu
-
-
$
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,998
Cost:
$6,000
- - - - $1,998 451 - - - - -
-
kWh
-
-
kW-months/year
$1,998
451
MMBtu
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$536
Cost:
$163
- - - - $536 121 - - - - -
-
kWh
-
-
kW-months/year
$536
121
MMBtu
-
-
$
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$20,688
Cost:
$8,572
- - - - $20,688 2,172 - - - - -
-
kWh
-
-
kW-months/year
$20,688
2,172
MMBtu
-
-
$
-
-
$
09: 2.7225 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS Savings:
$13,745
Cost:
$240
$10,890 335,160 $3,095 1,074 - - $(-240) - - - $10,890
335,160
kWh
$3,095
1,074
kW-months/year
-
-
MMBtu
$(-240)
-
$
-
-
$
10: 2.1224 REPLACE BOILER Savings:
$7,761
Cost:
$22,000
- - - - $7,761 1,752 - - - - -
-
kWh
-
-
kW-months/year
$7,761
1,752
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$55,200
Cost:
$44,437
$14,484 445,892 $3,585 1,147 $35,918 5,610 $585 - $628 - $14,484
445,892
kWh
$3,585
1,147
kW-months/year
$35,918
5,610
MMBtu
$585
-
$
$628
-
$
TOTAL IMPLEMENTED Savings:
$21,808
Cost:
$6,714
$14,214 437,570 $3,510 1,136 $4,324 976 $(-240) - - - $14,214
437,570
kWh
$3,510
1,136
kW-months/year
$4,324
976
MMBtu
$(-240)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost