IAC Assessment: OK0619
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0619
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Plastic Packaging
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 175,000
Annual Production 68,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $855,741 34,464,000 kWh $0.02
Electricity Demand $343,244 55,970 kW-months/year $6.13
Electricity Fees $282,984 - $ -
Natural Gas $17,779 3,012 MMBtu $5.90
TOTAL ENERGY COSTS $1,473,748
RECOMMENDED SAVINGS* $178,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,653
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$792
Cost:
$310
$82 3,294 $28 5 - - - - $168 - - - $514 - $82
3,294
kWh
$28
5
kW-months/year
-
-
MMBtu
-
-
gal
$168
-
$
-
-
$
$514
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,585
Cost:
$18,400
$1,974 79,609 $828 135 - - - - - - - - $2,783 - $1,974
79,609
kWh
$828
135
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$2,783
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$816
Cost:
$878
$816 32,890 - - - - - - - - - - - - $816
32,890
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,184
Cost:
$200
$2,453 98,910 $831 136 - - - - $(-100) - - - - - $2,453
98,910
kWh
$831
136
kW-months/year
-
-
MMBtu
-
-
gal
$(-100)
-
$
-
-
$
-
-
$
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,191
Cost:
$1,423
$891 35,916 $300 49 - - - - - - - - - - $891
35,916
kWh
$300
49
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$38,340
Cost:
$12,500
- - - - - - $38,340 4,810 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$38,340
4,810
gal
-
-
$
-
-
$
-
-
$
07: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$68,500
Cost:
$15,000
$68,500 2,761,986 - - - - - - - - - - - - $68,500
2,761,986
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,200
Cost:
$1,326
- - $2,200 360 - - - - - - - - - - -
-
kWh
$2,200
360
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,082
Cost:
$3,936
$2,303 92,856 $779 127 - - - - - - - - - - $2,303
92,856
kWh
$779
127
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,577
Cost:
$3,000
$1,013 40,827 - - $11,564 1,500 - - - - - - - - $1,013
40,827
kWh
-
-
kW-months/year
$11,564
1,500
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
11: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,523
Cost:
$10,275
$8,610 347,170 $2,913 475 - - - - - - - - - - $8,610
347,170
kWh
$2,913
475
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
12: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$29,565
Cost:
$10,000
- - - - - - - - $29,565 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$29,565
-
$
-
-
$
-
-
$
13: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$877
Cost:
-
- - - - - - - - - - $877 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$877
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$178,232
Cost:
$77,248
$86,642 3,493,458 $7,879 1,287 $11,564 1,500 $38,340 4,810 $29,633 - $877 - $3,297 - $86,642
3,493,458
kWh
$7,879
1,287
kW-months/year
$11,564
1,500
MMBtu
$38,340
4,810
gal
$29,633
-
$
$877
-
$
$3,297
-
$
TOTAL IMPLEMENTED Savings:
$99,653
Cost:
$30,111
$80,658 3,252,187 $5,972 976 $11,564 1,500 - - $68 - $877 - $514 - $80,658
3,252,187
kWh
$5,972
976
kW-months/year
$11,564
1,500
MMBtu
-
-
gal
$68
-
$
$877
-
$
$514
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost