IAC Assessment: OK0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Aluminum Cans
NAICS n/a
SIC 3411 - Metal Cans
Sales $50,000,000-$100,000,000
# of Employees 77
Plant Area (Sq.Ft.) 108,000
Annual Production 1,100,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,943 18,771,200 kWh $0.03
Electricity Demand $193,086 - kW-months/year -
Electricity Fees $203,904 - $ -
Natural Gas $392,431 59,663 MMBtu $6.58
TOTAL ENERGY COSTS $1,311,731
RECOMMENDED SAVINGS* $66,088 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,472
Cost:
$11,200
- - - - $4,472 646 - - - - - - -
-
kWh
-
-
kW-months/year
$4,472
646
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,077
Cost:
$15,842
$689 26,280 $235 36 - - - - $3,153 - - - $689
26,280
kWh
$235
36
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,153
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$534
Cost:
$1,045
$534 33,954 - - - - - - - - - - $534
33,954
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$25,294
Cost:
$2,457
$2,678 81,687 - - $22,616 3,292 - - - - - - $2,678
81,687
kWh
-
-
kW-months/year
$22,616
3,292
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$28,667
Cost:
$14,150
$21,402 816,870 $7,265 1,116 - - - - - - - - $21,402
816,870
kWh
$7,265
1,116
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,044
Cost:
$2,350
- - - - $1,113 162 $919 621,000 - - $1,012 - -
-
kWh
-
-
kW-months/year
$1,113
162
MMBtu
$919
621,000
Tgal
-
-
$
$1,012
-
Tgal
TOTAL RECOMMENDED Savings:
$66,088
Cost:
$47,044
$25,303 958,791 $7,500 1,152 $28,201 4,100 $919 621,000 $3,153 - $1,012 - $25,303
958,791
kWh
$7,500
1,152
kW-months/year
$28,201
4,100
MMBtu
$919
621,000
Tgal
$3,153
-
$
$1,012
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption