IAC Assessment: OK0627
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0627
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Blow Molding Products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 67,190
Annual Production 28,500,000 Pounds
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $735,045 15,061,032 kWh $0.05
Electricity Demand $58,292 - kW-months/year -
Electricity Fees $3,110 - $ -
Natural Gas $7,040 748 MMBtu $9.41
TOTAL ENERGY COSTS $804,687
RECOMMENDED SAVINGS* $35,578 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,466
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,445
Cost:
$200
$2,304 46,080 $141 5 - - - - $2,304
46,080
kWh
$141
5
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,466
Cost:
$9,056
$10,074 201,480 $619 23 - - $(-1,227) - $10,074
201,480
kWh
$619
23
kW-months/year
-
-
MMBtu
$(-1,227)
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,270
Cost:
$1,050
- - - - $4,270 410 - - -
-
kWh
-
-
kW-months/year
$4,270
410
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,203
Cost:
$7,500
$17,154 343,085 $1,049 39 - - - - $17,154
343,085
kWh
$1,049
39
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,194
Cost:
$1,680
$1,194 23,870 - - - - - - $1,194
23,870
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,578
Cost:
$19,486
$30,726 614,515 $1,809 67 $4,270 410 $(-1,227) - $30,726
614,515
kWh
$1,809
67
kW-months/year
$4,270
410
MMBtu
$(-1,227)
-
$
TOTAL IMPLEMENTED Savings:
$9,466
Cost:
$9,056
$10,074 201,480 $619 23 - - $(-1,227) - $10,074
201,480
kWh
$619
23
kW-months/year
-
-
MMBtu
$(-1,227)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost