IAC Assessment: OK0628
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Wrenches
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 195,000
Annual Production 44,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,185,304 39,880,800 kWh $0.03
Electricity Demand $438,581 92,570 kW-months/year $4.74
Electricity Fees $109,327 - $ -
Natural Gas $792,675 137,377 MMBtu $5.77
TOTAL ENERGY COSTS $2,704,887
RECOMMENDED SAVINGS* $654,261 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $129,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$8,150
Cost:
$310
- - - - $8,150 1,458 - - -
-
kWh
-
-
kW-months/year
$8,150
1,458
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$357
Cost:
$613
$357 11,987 - - - - - - $357
11,987
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,940
Cost:
$3,013
- - - - $2,940 526 - - -
-
kWh
-
-
kW-months/year
$2,940
526
MMBtu
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,448
Cost:
$1,500
- - - - $2,448 438 - - -
-
kWh
-
-
kW-months/year
$2,448
438
MMBtu
-
-
$
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$39,477
Cost:
$20,922
- - - - $39,477 7,062 - - -
-
kWh
-
-
kW-months/year
$39,477
7,062
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$75,988
Cost:
$752
$62,391 2,093,640 $13,597 2,868 - - - - $62,391
2,093,640
kWh
$13,597
2,868
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$20,767
Cost:
$5,653
- - - - $20,767 3,715 - - -
-
kWh
-
-
kW-months/year
$20,767
3,715
MMBtu
-
-
$
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$456,570
Cost:
$93,000
- - - - $456,570 81,676 - - -
-
kWh
-
-
kW-months/year
$456,570
81,676
MMBtu
-
-
$
09: 4.1320 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$5,452
Cost:
$500
- - - - - - $5,452 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,452
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$42,112
Cost:
$100,000
- - - - - - $42,112 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$42,112
-
$
TOTAL RECOMMENDED Savings:
$654,261
Cost:
$226,263
$62,748 2,105,627 $13,597 2,868 $530,352 94,875 $47,564 - $62,748
2,105,627
kWh
$13,597
2,868
kW-months/year
$530,352
94,875
MMBtu
$47,564
-
$
TOTAL IMPLEMENTED Savings:
$129,360
Cost:
$27,110
$62,748 2,105,627 $13,597 2,868 $53,015 9,484 - - $62,748
2,105,627
kWh
$13,597
2,868
kW-months/year
$53,015
9,484
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes