IAC logo
IAC Assessment: OK0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Extruded Building Materials
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 103,741
Annual Production 50,000 Tons
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $553,563 16,593,600 kWh $0.03
Electricity Demand $122,478 25,740 kW-months/year $4.76
Electricity Fees $51,254 - $ -
Natural Gas $23,495 4,154 MMBtu $5.66
TOTAL ENERGY COSTS $831,190
RECOMMENDED SAVINGS* $207,507 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $207,507
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,487
Cost:
$400
$13,198 395,152 $2,389 504 $(-100) - $13,198
395,152
kWh
$2,389
504
kW-months/year
$(-100)
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,831
Cost:
$8,000
$13,831 414,108 - - - - $13,831
414,108
kWh
-
-
kW-months/year
-
-
$
03: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,991
Cost:
$194
$1,667 49,920 $324 68 - - $1,667
49,920
kWh
$324
68
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,478
Cost:
$6,067
$1,478 174,564 - - - - $1,478
174,564
kWh
-
-
kW-months/year
-
-
$
05: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$174,720
Cost:
$364,000
- - - - $174,720 - -
-
kWh
-
-
kW-months/year
$174,720
-
$
TOTAL RECOMMENDED Savings:
$207,507
Cost:
$378,661
$30,174 1,033,744 $2,713 572 $174,620 - $30,174
1,033,744
kWh
$2,713
572
kW-months/year
$174,620
-
$
TOTAL IMPLEMENTED Savings:
$207,507
Cost:
$378,661
$30,174 1,033,744 $2,713 572 $174,620 - $30,174
1,033,744
kWh
$2,713
572
kW-months/year
$174,620
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes