IAC logo
IAC Assessment: OK0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Maple syrup, mustard, coconut
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 234,000
Annual Production 0 Units
Production Hrs. Annual 6,864
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,500 1,719,582 kWh $0.04
Electricity Demand $43,319 4,800 kW-months/year $9.02
Electricity Fees $8,413 - $ -
Natural Gas $156,867 25,747 MMBtu $6.09
TOTAL ENERGY COSTS $412,099
RECOMMENDED SAVINGS* $73,642 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,847
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,496
Cost:
$823
- - - - $2,496 357 - - - - -
-
kWh
-
-
kW-months/year
$2,496
357
MMBtu
-
-
$
-
-
$
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$2,910
Cost:
$4,125
- - - - $2,910 416 - - - - -
-
kWh
-
-
kW-months/year
$2,910
416
MMBtu
-
-
$
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,571
Cost:
$6,000
- - - - $4,571 653 - - - - -
-
kWh
-
-
kW-months/year
$4,571
653
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$218
Cost:
$255
- - - - $218 31 - - - - -
-
kWh
-
-
kW-months/year
$218
31
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$532
Cost:
$282
$532 14,414 - - - - - - - - $532
14,414
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$992
Cost:
$1,679
$613 16,626 $209 23 - - $68 - $102 - $613
16,626
kWh
$209
23
kW-months/year
-
-
MMBtu
$68
-
$
$102
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$216
Cost:
$2,500
$152 4,120 $64 7 - - - - - - $152
4,120
kWh
$64
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,297
Cost:
$1,028
$7,397 200,466 - - - - $(-100) - - - $7,397
200,466
kWh
-
-
kW-months/year
-
-
MMBtu
$(-100)
-
$
-
-
$
09: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$20,476
Cost:
$1,800
- - - - $20,476 2,061 - - - - -
-
kWh
-
-
kW-months/year
$20,476
2,061
MMBtu
-
-
$
-
-
$
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$33,934
Cost:
$525
- - - - $34,184 4,915 $(-150) - $(-100) - -
-
kWh
-
-
kW-months/year
$34,184
4,915
MMBtu
$(-150)
-
$
$(-100)
-
$
TOTAL RECOMMENDED Savings:
$73,642
Cost:
$19,017
$8,694 235,626 $273 30 $64,855 8,433 $(-182) - $2 - $8,694
235,626
kWh
$273
30
kW-months/year
$64,855
8,433
MMBtu
$(-182)
-
$
$2
-
$
TOTAL IMPLEMENTED Savings:
$47,847
Cost:
$8,435
$8,010 217,092 $209 23 $39,808 5,719 $(-182) - $2 - $8,010
217,092
kWh
$209
23
kW-months/year
$39,808
5,719
MMBtu
$(-182)
-
$
$2
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost