Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2002 |
Principal Product | Fabricated Metal |
NAICS | n/a |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 188,000 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $169,889 | 6,584,832 | kWh | $0.03 |
Electricity Fees | $15,695 | - | $ | - |
Natural Gas | $66,048 | 17,109 | MMBtu | $3.86 |
TOTAL ENERGY COSTS | $(-1,068) | |||
RECOMMENDED SAVINGS* | $216,512 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $192,175 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,565 Cost: $16,300 |
$5,565 | 215,654 | - | - | - | - | - | - |
$5,565 215,654 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2514 COVER OPEN TANKS |
Savings: $2,412 Cost: $528 |
- | - | $2,412 | 513 | - | - | - | - |
- - kWh |
$2,412 513 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,525 Cost: $1,500 |
- | - | $6,525 | 1,329 | - | - | - | - |
- - kWh |
$6,525 1,329 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $175,200 Cost: $12,800 |
- | - | - | - | - | - | $175,200 | - |
- - kWh |
- - MMBtu |
- - lb |
$175,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,410 Cost: $1,400 |
$12,160 | 471,330 | - | - | - | - | $(-750) | - |
$12,160 471,330 kWh |
- - MMBtu |
- - lb |
$(-750) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $15,400 Cost: $22,800 |
- | - | $4,200 | 900 | $16,000 | 430,285 | $(-4,800) | - |
- - kWh |
$4,200 900 MMBtu |
$16,000 430,285 lb |
$(-4,800) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $216,512 Cost: $55,328 |
$17,725 | 686,984 | $13,137 | 2,742 | $16,000 | 430,285 | $169,650 | - | $17,725 686,984 kWh |
$13,137 2,742 MMBtu |
$16,000 430,285 lb |
$169,650 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $192,175 Cost: $30,500 |
$17,725 | 686,984 | - | - | - | - | $174,450 | - | $17,725 686,984 kWh |
- - MMBtu |
- - lb |
$174,450 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Personnel Changes |