IAC logo
IAC Assessment: OK0637
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0637
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Wood Crates and Pallets
NAICS n/a
SIC 2448 - Wood Pallets And Skids
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 20,000
Annual Production 250,000 Pieces
Production Hrs. Annual 3,120
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,094 742,550 kWh $0.03
Electricity Demand $12,266 - kW-months/year -
Electricity Fees $2,404 - $ -
Natural Gas $1,225 127 MMBtu $9.65
LPG $5,959 694 MMBtu $8.59
TOTAL ENERGY COSTS $41,246
RECOMMENDED SAVINGS* $14,774 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,271
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$503
Cost:
$2
- - - - $503 57 - - - - -
-
kWh
-
-
kW-months/year
$503
57
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$91
Cost:
$185
$91 2,496 - - - - - - - - $91
2,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,484
Cost:
-
- - $6,484 1,968 - - - - - - -
-
kWh
$6,484
1,968
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$5,814
Cost:
$8,286
- - - - - - - - $5,814 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,814
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,882
Cost:
$630
$1,618 44,428 $564 171 - - $(-300) - - - $1,618
44,428
kWh
$564
171
kW-months/year
-
-
MMBtu
$(-300)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,774
Cost:
$9,103
$1,709 46,924 $7,048 2,139 $503 57 $(-300) - $5,814 - $1,709
46,924
kWh
$7,048
2,139
kW-months/year
$503
57
MMBtu
$(-300)
-
$
$5,814
-
$
TOTAL IMPLEMENTED Savings:
$14,271
Cost:
$9,101
$1,709 46,924 $7,048 2,139 - - $(-300) - $5,814 - $1,709
46,924
kWh
$7,048
2,139
kW-months/year
-
-
MMBtu
$(-300)
-
$
$5,814
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product