IAC logo
IAC Assessment: OK0642
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0642
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Corrugated Cardboard
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 164
Plant Area (Sq.Ft.) 200,000
Annual Production 830,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,081 4,943,520 kWh $0.03
Electricity Demand $64,060 - kW-months/year -
Electricity Fees $16,434 - $ -
Natural Gas $272,630 44,436 MMBtu $6.14
TOTAL ENERGY COSTS $344,205
RECOMMENDED SAVINGS* $304,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,721
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,760
Cost:
$9,780
- - - - $5,760 1,567 - - - - - - -
-
kWh
-
-
kW-months/year
$5,760
1,567
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,120
Cost:
$900
$3,420 98,856 - - - - - - $(-300) - - - $3,420
98,856
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-300)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,265
Cost:
$10
$859 24,830 $406 72 - - - - - - - - $859
24,830
kWh
$406
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,998
Cost:
$15,836
$3,644 105,331 $1,146 203 - - - - - - $5,208 - $3,644
105,331
kWh
$1,146
203
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$5,208
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$711
Cost:
$450
$711 20,571 - - - - - - - - - - $711
20,571
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,130
Cost:
$332
- - - - $2,130 579 - - - - - - -
-
kWh
-
-
kW-months/year
$2,130
579
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$446
Cost:
-
$243 7,020 $203 36 - - - - - - - - $243
7,020
kWh
$203
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$245,550
Cost:
$11,639
- - - - - - $244,200 1,320,000 $5,400 - $(-4,050) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$244,200
1,320,000
lb
$5,400
-
$
$(-4,050)
-
$
09: 4.4260 MODIFY WORKLOAD Savings:
$35,955
Cost:
-
- - - - - - - - $41,600 - $(-5,645) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$41,600
-
$
$(-5,645)
-
$
TOTAL RECOMMENDED Savings:
$304,935
Cost:
$38,947
$8,877 256,608 $1,755 311 $7,890 2,146 $244,200 1,320,000 $46,700 - $(-4,487) - $8,877
256,608
kWh
$1,755
311
kW-months/year
$7,890
2,146
MMBtu
$244,200
1,320,000
lb
$46,700
-
$
$(-4,487)
-
$
TOTAL IMPLEMENTED Savings:
$12,721
Cost:
$11,022
$4,522 130,706 $609 108 $7,890 2,146 - - $(-300) - - - $4,522
130,706
kWh
$609
108
kW-months/year
$7,890
2,146
MMBtu
-
-
lb
$(-300)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost