IAC logo
IAC Assessment: OK0647
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0647
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Medium Density Fiberboard
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 166,840
Annual Production 400,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,454,752 33,636,325 kWh $0.04
Natural Gas $1,197,843 241,525 MMBtu $4.96
TOTAL ENERGY COSTS $2,712,595
RECOMMENDED SAVINGS* $379,428 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $251,676
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$42,712
Cost:
$2,250
$42,712 1,123,974 - - - - $42,712
1,123,974
kWh
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$29,330
Cost:
$9,344
- - $29,330 9,777 - - -
-
kWh
$29,330
9,777
MMBtu
-
-
$
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$21,369
Cost:
$15,150
- - $21,369 7,123 - - -
-
kWh
$21,369
7,123
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,658
Cost:
$3,635
$16,658 438,380 - - - - $16,658
438,380
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,788
Cost:
$9,041
- - $11,788 4,336 - - -
-
kWh
$11,788
4,336
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,412
Cost:
$3,349
$2,412 63,484 - - - - $2,412
63,484
kWh
-
-
MMBtu
-
-
$
07: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$166,400
Cost:
$208,754
- - - - $166,400 - -
-
kWh
-
-
MMBtu
$166,400
-
$
08: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$87,000
Cost:
$5,400
- - - - $87,000 - -
-
kWh
-
-
MMBtu
$87,000
-
$
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,446
Cost:
$372
- - $1,446 292 - - -
-
kWh
$1,446
292
MMBtu
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$313
Cost:
$395
$313 8,237 - - - - $313
8,237
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$379,428
Cost:
$257,690
$62,095 1,634,075 $63,933 21,528 $253,400 - $62,095
1,634,075
kWh
$63,933
21,528
MMBtu
$253,400
-
$
TOTAL IMPLEMENTED Savings:
$251,676
Cost:
$229,761
$42,712 1,123,974 $42,564 14,405 $166,400 - $42,712
1,123,974
kWh
$42,564
14,405
MMBtu
$166,400
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes