IAC logo
IAC Assessment: OK0648
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0648
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Plastic Resin
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 43,500
Annual Production 42,500 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,410 5,380,000 kWh $0.02
Electricity Demand $92,971 - kW-months/year -
Electricity Fees $1,670 - $ -
Natural Gas $394,066 131,296 MMBtu $3.00
TOTAL ENERGY COSTS $628,829
RECOMMENDED SAVINGS* $298,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,766
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$12,108
Cost:
$2,317
- - - - - - $12,108 4,036 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,108
4,036
MMBtu
-
-
$
-
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$38,422
Cost:
$70,536
$(-2,340) (-130,715) $(-1,706) (-17) - - $42,468 14,156 - - - - $(-2,340)
(-130,715)
kWh
$(-1,706)
(-17)
kW-months/year
-
-
$
$42,468
14,156
MMBtu
-
-
$
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,590
Cost:
$4,344
- - - - $4,590 - - - - - - - -
-
kWh
-
-
kW-months/year
$4,590
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,975
Cost:
$4,500
$2,975 166,120 - - - - - - - - - - $2,975
166,120
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$6,955
Cost:
$22,000
- - - - - - - - - - $6,955 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$6,955
-
$
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$59,232
Cost:
$12,200
- - - - - - - - $59,232 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$59,232
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,683
Cost:
$240
$1,923 107,460 - - - - - - $(-240) - - - $1,923
107,460
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-240)
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$94
Cost:
$288
$94 5,460 - - - - - - - - - - $94
5,460
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$169,242
Cost:
$37,910
- - - - - - $169,242 56,414 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$169,242
56,414
MMBtu
-
-
$
-
-
$
10: 2.2514 COVER OPEN TANKS Savings:
$1,983
Cost:
$752
- - - - - - $1,983 661 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,983
661
MMBtu
-
-
$
-
-
$
11: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,458
Cost:
$702
- - - - - - $1,458 379 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,458
379
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$298,742
Cost:
$155,789
$2,652 148,325 $(-1,706) (-17) $4,590 - $227,259 75,646 $58,992 - $6,955 - $2,652
148,325
kWh
$(-1,706)
(-17)
kW-months/year
$4,590
-
$
$227,259
75,646
MMBtu
$58,992
-
$
$6,955
-
$
TOTAL IMPLEMENTED Savings:
$16,766
Cost:
$7,057
$4,898 273,580 - - - - $12,108 4,036 $(-240) - - - $4,898
273,580
kWh
-
-
kW-months/year
-
-
$
$12,108
4,036
MMBtu
$(-240)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes