IAC logo
IAC Assessment: OK0650
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0650
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2002
Principal Product Calcined Petroleum Coke
NAICS n/a
SIC 2999 - Petroleum And Coal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 73
Plant Area (Sq.Ft.) 306,000
Annual Production 500,000 Tons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $251,381 8,435,200 kWh $0.03
Electricity Demand $121,039 122,765 kW-months/year $0.99
Electricity Fees $2,764 - $ -
Natural Gas $777,924 151,465 MMBtu $5.14
TOTAL ENERGY COSTS $1,081,406
RECOMMENDED SAVINGS* $5,768,423 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,276
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,203
Cost:
$1,190
$1,203 46,253 - - - - - - - - - - $1,203
46,253
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,073
Cost:
$100
$3,671 141,193 $1,402 1,488 - - - - - - - - $3,671
141,193
kWh
$1,402
1,488
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$56,715
Cost:
$16,956
- - - - $56,715 10,543 - - - - - - -
-
kWh
-
-
kW-months/year
$56,715
10,543
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$133,632
Cost:
$206,750
- - - - $133,632 24,843 - - - - - - -
-
kWh
-
-
kW-months/year
$133,632
24,843
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$4,021,800
Cost:
$30,000,000
- - - - - - - - $4,021,800 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,021,800
-
$
-
-
$
06: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$1,550,000
Cost:
$150,000
- - - - - - $(-50,000) - - - $1,600,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-50,000)
-
$
-
-
$
$1,600,000
-
$
TOTAL RECOMMENDED Savings:
$5,768,423
Cost:
$30,374,996
$4,874 187,446 $1,402 1,488 $190,347 35,386 $(-50,000) - $4,021,800 - $1,600,000 - $4,874
187,446
kWh
$1,402
1,488
kW-months/year
$190,347
35,386
MMBtu
$(-50,000)
-
$
$4,021,800
-
$
$1,600,000
-
$
TOTAL IMPLEMENTED Savings:
$6,276
Cost:
$1,290
$4,874 187,446 $1,402 1,488 - - - - - - - - $4,874
187,446
kWh
$1,402
1,488
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material