Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2003 |
Principal Product | Metal Stampings |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 15 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $110,115 | 3,019,026 | kWh | $0.04 |
Electricity Demand | $62,140 | 9,560 | kW-months/year | $6.50 |
Electricity Fees | $5,336 | - | $ | - |
Natural Gas | $79,739 | 16,972 | MMBtu | $4.70 |
TOTAL ENERGY COSTS | $281,659 | |||
RECOMMENDED SAVINGS* | $102,162 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,697 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $10,530 Cost: $6,844 |
- | - | $10,530 | 1,620 | - | - | - | - |
- - kWh |
$10,530 1,620 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $14,697 Cost: $8,210 |
- | - | - | - | $14,697 | 2,468 | - | - |
- - kWh |
- - kW-months/year |
$14,697 2,468 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,582 Cost: $600 |
$5,882 | 214,445 | - | - | - | - | $(-300) | - |
$5,882 214,445 kWh |
- - kW-months/year |
- - MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $3,904 Cost: $13,860 |
- | - | - | - | $3,904 | 557 | - | - |
- - kWh |
- - kW-months/year |
$3,904 557 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $5,337 Cost: $3,280 |
- | - | - | - | $5,337 | 896 | - | - |
- - kWh |
- - kW-months/year |
$5,337 896 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $25,432 Cost: $4,800 |
- | - | - | - | - | - | $25,432 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$25,432 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $36,680 Cost: $73,250 |
- | - | - | - | - | - | $36,680 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$36,680 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $102,162 Cost: $110,844 |
$5,882 | 214,445 | $10,530 | 1,620 | $23,938 | 3,921 | $61,812 | - | $5,882 214,445 kWh |
$10,530 1,620 kW-months/year |
$23,938 3,921 MMBtu |
$61,812 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,697 Cost: $8,210 |
- | - | - | - | $14,697 | 2,468 | - | - | - - kWh |
- - kW-months/year |
$14,697 2,468 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |