IAC logo
IAC Assessment: OK0653
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0653
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Metal Stampings
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 75,000
Annual Production 15 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,115 3,019,026 kWh $0.04
Electricity Demand $62,140 9,560 kW-months/year $6.50
Electricity Fees $5,336 - $ -
Natural Gas $79,739 16,972 MMBtu $4.70
TOTAL ENERGY COSTS $281,659
RECOMMENDED SAVINGS* $102,162 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,697
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,530
Cost:
$6,844
- - $10,530 1,620 - - - - -
-
kWh
$10,530
1,620
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$14,697
Cost:
$8,210
- - - - $14,697 2,468 - - -
-
kWh
-
-
kW-months/year
$14,697
2,468
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,582
Cost:
$600
$5,882 214,445 - - - - $(-300) - $5,882
214,445
kWh
-
-
kW-months/year
-
-
MMBtu
$(-300)
-
$
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$3,904
Cost:
$13,860
- - - - $3,904 557 - - -
-
kWh
-
-
kW-months/year
$3,904
557
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$5,337
Cost:
$3,280
- - - - $5,337 896 - - -
-
kWh
-
-
kW-months/year
$5,337
896
MMBtu
-
-
$
06: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$25,432
Cost:
$4,800
- - - - - - $25,432 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,432
-
$
07: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$36,680
Cost:
$73,250
- - - - - - $36,680 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$36,680
-
$
TOTAL RECOMMENDED Savings:
$102,162
Cost:
$110,844
$5,882 214,445 $10,530 1,620 $23,938 3,921 $61,812 - $5,882
214,445
kWh
$10,530
1,620
kW-months/year
$23,938
3,921
MMBtu
$61,812
-
$
TOTAL IMPLEMENTED Savings:
$14,697
Cost:
$8,210
- - - - $14,697 2,468 - - -
-
kWh
-
-
kW-months/year
$14,697
2,468
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes