IAC logo
IAC Assessment: OK0659
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0659
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Poultry Processing and Packaging
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 1,540
Plant Area (Sq.Ft.) 99,544
Annual Production 376,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $331,826 15,755,161 kWh $0.02
Electricity Demand $153,978 38,148 kW-months/year $4.04
Electricity Fees $332,047 - $ -
Natural Gas $558,773 133,989 MMBtu $4.17
TOTAL ENERGY COSTS $2,716,558
RECOMMENDED SAVINGS* $453,231 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,223
Cost:
$640
$5,386 251,694 $1,937 484 - - $(-100) - - - - - $5,386
251,694
kWh
$1,937
484
kW-months/year
-
-
MMBtu
$(-100)
-
$
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,179
Cost:
$4,683
$585 27,331 $264 66 - - - - $330 - - - $585
27,331
kWh
$264
66
kW-months/year
-
-
MMBtu
-
-
$
$330
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,247
Cost:
$927
$1,247 58,292 - - - - - - - - - - $1,247
58,292
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,627
Cost:
$31,408
- - - - $8,627 2,152 - - - - - - -
-
kWh
-
-
kW-months/year
$8,627
2,152
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$52,195
Cost:
$19,043
$(-403) (-18,832) - - $52,598 13,120 - - - - - - $(-403)
(-18,832)
kWh
-
-
kW-months/year
$52,598
13,120
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$7,958
Cost:
$100
$55 2,586 - - - - - - - - $7,903 - $55
2,586
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$7,903
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$49,802
Cost:
$152,022
$49,802 2,327,178 - - - - - - - - - - $49,802
2,327,178
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$325,000
Cost:
$625,000
- - - - - - $325,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$325,000
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$453,231
Cost:
$833,823
$56,672 2,648,249 $2,201 550 $61,225 15,272 $324,900 - $330 - $7,903 - $56,672
2,648,249
kWh
$2,201
550
kW-months/year
$61,225
15,272
MMBtu
$324,900
-
$
$330
-
$
$7,903
-
Tgal
TOTAL IMPLEMENTED Savings:
$16,360
Cost:
$5,423
$6,026 281,611 $2,201 550 - - $(-100) - $330 - $7,903 - $6,026
281,611
kWh
$2,201
550
kW-months/year
-
-
MMBtu
$(-100)
-
$
$330
-
$
$7,903
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption