IAC Assessment: OK0661
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0661
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Fan Coil Units
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 161,000
Annual Production 90,000 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,791 5,446,800 kWh $0.03
Electricity Demand $141,120 13,402 kW-months/year $10.53
Electricity Fees $9,907 - $ -
Natural Gas $53,403 13,224 MMBtu $4.04
TOTAL ENERGY COSTS $45,693
RECOMMENDED SAVINGS* $133,689 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$72,173
Cost:
-
- - $72,173 6,854 - - - - - - - - -
-
kWh
$72,173
6,854
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$20,400
Cost:
-
- - - - - - - - $6,000 - $14,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$6,000
-
$
$14,400
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,245
Cost:
$7,483
- - - - $8,245 2,042 - - - - - - -
-
kWh
-
-
kW-months/year
$8,245
2,042
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,319
Cost:
$823
$2,018 74,476 $1,757 215 - - - - $(-456) - - - $2,018
74,476
kWh
$1,757
215
kW-months/year
-
-
MMBtu
-
-
$
$(-456)
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,271
Cost:
$3,206
- - $1,271 298 - - - - - - - - -
-
kWh
$1,271
298
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$3,339
Cost:
$168
$1,883 69,472 $756 200 $1,708 423 - - $(-1,008) - - - $1,883
69,472
kWh
$756
200
kW-months/year
$1,708
423
MMBtu
-
-
$
$(-1,008)
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$441
Cost:
$262
$441 16,286 - - - - - - - - - - $441
16,286
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$13,061
Cost:
$45,000
$13,061 481,970 - - - - - - - - - - $13,061
481,970
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$11,440
Cost:
$2,500
- - - - - - $11,440 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,440
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,689
Cost:
$59,442
$17,403 642,204 $75,957 7,567 $9,953 2,465 $11,440 - $4,536 - $14,400 - $17,403
642,204
kWh
$75,957
7,567
kW-months/year
$9,953
2,465
MMBtu
$11,440
-
$
$4,536
-
$
$14,400
-
$
TOTAL IMPLEMENTED Savings:
$48,220
Cost:
$48,323
$15,079 556,446 $1,757 215 - - $11,440 - $5,544 - $14,400 - $15,079
556,446
kWh
$1,757
215
kW-months/year
-
-
MMBtu
$11,440
-
$
$5,544
-
$
$14,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product