IAC Assessment: OK0669
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0669
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2003
Principal Product Hydraulic motors
NAICS 333996 - Fluid Power Pump and Motor Manufacturing
SIC 3594 - Fluid Power Pumps And Motors
Sales $1,000,000-$5,000,000
# of Employees 350
Plant Area (Sq.Ft.) 223,600
Annual Production 338,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $501,929 20,097,600 kWh $0.02
Electricity Demand $223,001 17,883 kW-months/year $12.47
Electricity Fees $131,266 - $ -
Natural Gas $49,785 23,566 MMBtu $2.11
TOTAL ENERGY COSTS $947,932
RECOMMENDED SAVINGS* $126,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,148
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$79,727
Cost:
$15,485
$779 31,147 - - - - $198 94 $78,750 - $779
31,147
kWh
-
-
kW-months/year
-
-
$
$198
94
MMBtu
$78,750
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,435
Cost:
$8,500
- - $10,435 1,495 - - - - - - -
-
kWh
$10,435
1,495
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,611
Cost:
$12,000
- - - - $19,611 - - - - - -
-
kWh
-
-
kW-months/year
$19,611
-
$
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,626
Cost:
$3,500
$6,041 241,630 $1,585 300 - - - - - - $6,041
241,630
kWh
$1,585
300
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,966
Cost:
$3,467
$1,966 78,663 - - - - - - - - $1,966
78,663
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,069
Cost:
$463
- - - - - - $1,069 506 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,069
506
MMBtu
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,052
Cost:
$1,468
$6,052 242,100 - - - - - - - - $6,052
242,100
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$126,486
Cost:
$44,883
$14,838 593,540 $12,020 1,795 $19,611 - $1,267 600 $78,750 - $14,838
593,540
kWh
$12,020
1,795
kW-months/year
$19,611
-
$
$1,267
600
MMBtu
$78,750
-
$
TOTAL IMPLEMENTED Savings:
$27,148
Cost:
$17,398
$14,059 562,393 $12,020 1,795 - - $1,069 506 - - $14,059
562,393
kWh
$12,020
1,795
kW-months/year
-
-
$
$1,069
506
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes