Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2003 |
Principal Product | Wire Products |
NAICS | 331222 - Steel Wire Drawing |
SIC | 3315 - Steel Wire And Related Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 270 |
Plant Area (Sq.Ft.) | 300,020 |
Annual Production | 138,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,428,445 | 51,106,406 | kWh | $0.03 |
Electricity Demand | $667,902 | 84,249 | kW-months/year | $7.93 |
Electricity Fees | $(-239,254) | - | $ | - |
Natural Gas | $1,444,355 | 328,247 | MMBtu | $4.40 |
TOTAL ENERGY COSTS | $3,410,277 | |||
RECOMMENDED SAVINGS* | $463,128 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,664 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $8,017 Cost: $1,000 |
- | - | - | - | $8,017 | 1,822 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,017 1,822 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $233,293 Cost: $16,564 |
$(-861) | 30,753 | $(-333) | 42 | $234,487 | 53,290 | - | - | - | - |
$(-861) 30,753 kWh |
$(-333) 42 kW-months/year |
$234,487 53,290 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $26,256 Cost: $34,540 |
- | - | - | - | $26,256 | 5,967 | - | - | - | - |
- - kWh |
- - kW-months/year |
$26,256 5,967 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $7,440 Cost: $670 |
$5,641 | 201,480 | $2,189 | 276 | - | - | - | - | $(-390) | - |
$5,641 201,480 kWh |
$2,189 276 kW-months/year |
- - MMBtu |
- - $ |
$(-390) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $12,926 Cost: - |
$12,926 | 461,652 | - | - | - | - | - | - | - | - |
$12,926 461,652 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $14,207 Cost: $1,007 |
$10,668 | 380,986 | $4,139 | 522 | - | - | $(-600) | - | - | - |
$10,668 380,986 kWh |
$4,139 522 kW-months/year |
- - MMBtu |
$(-600) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $160,989 Cost: $2,444,362 |
$69,292 | 2,474,704 | $16,177 | 2,040 | - | - | $75,520 | - | - | - |
$69,292 2,474,704 kWh |
$16,177 2,040 kW-months/year |
- - MMBtu |
$75,520 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $463,128 Cost: $2,498,143 |
$97,666 | 3,549,575 | $22,172 | 2,880 | $268,760 | 61,079 | $74,920 | - | $(-390) | - | $97,666 3,549,575 kWh |
$22,172 2,880 kW-months/year |
$268,760 61,079 MMBtu |
$74,920 - $ |
$(-390) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,664 Cost: $2,677 |
$16,309 | 582,466 | $6,328 | 798 | $8,017 | 1,822 | $(-600) | - | $(-390) | - | $16,309 582,466 kWh |
$6,328 798 kW-months/year |
$8,017 1,822 MMBtu |
$(-600) - $ |
$(-390) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |