Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2004 |
Principal Product | Castings |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 36 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 18,000 Pieces |
Production Hrs. Annual | 5,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $105,754 | 1,555,200 | kWh | $0.07 |
Electricity Fees | $9,869 | - | $ | - |
Natural Gas | $46,492 | 6,375 | MMBtu | $7.29 |
TOTAL ENERGY COSTS | $162,115 | |||
RECOMMENDED SAVINGS* | $34,453 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,252 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $12,973 Cost: - |
- | - | $12,973 | - | - | - | - | - | - | - |
- - kWh |
$12,973 - $ |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $3,034 Cost: $2,400 |
$3,034 | 40,832 | - | - | - | - | - | - | - | - |
$3,034 40,832 kWh |
- - $ |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,575 Cost: $3,782 |
- | - | - | - | $7,575 | 1,298 | - | - | - | - |
- - kWh |
- - $ |
$7,575 1,298 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,211 Cost: $535 |
$6,379 | 85,863 | - | - | - | - | $(-168) | - | - | - |
$6,379 85,863 kWh |
- - $ |
- - MMBtu |
$(-168) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $2,882 Cost: $3,690 |
$2,882 | 38,792 | - | - | - | - | - | - | - | - |
$2,882 38,792 kWh |
- - $ |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $763 Cost: $5,444 |
$1,088 | 14,667 | - | - | - | - | - | - | $(-325) | - |
$1,088 14,667 kWh |
- - $ |
- - MMBtu |
- - $ |
$(-325) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $464 Cost: $745 |
$247 | 3,329 | - | - | - | - | $217 | - | - | - |
$247 3,329 kWh |
- - $ |
- - MMBtu |
$217 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $550 Cost: $1,846 |
$657 | 8,840 | - | - | - | - | $(-107) | - | - | - |
$657 8,840 kWh |
- - $ |
- - MMBtu |
$(-107) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,453 Cost: $18,442 |
$14,288 | 192,323 | $12,973 | - | $7,575 | 1,298 | $(-58) | - | $(-325) | - | $14,288 192,323 kWh |
$12,973 - $ |
$7,575 1,298 MMBtu |
$(-58) - $ |
$(-325) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,252 Cost: $12,253 |
$12,952 | 174,327 | - | - | $7,575 | 1,298 | $(-275) | - | - | - | $12,952 174,327 kWh |
- - $ |
$7,575 1,298 MMBtu |
$(-275) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost |