Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2004 |
Principal Product | Large Custom HVAC Units |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 145 |
Plant Area (Sq.Ft.) | 126,000 |
Annual Production | 187 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $53,871 | 1,726,020 | kWh | $0.03 |
Electricity Demand | $27,258 | 5,845 | kW-months/year | $4.66 |
Electricity Fees | $13,133 | - | $ | - |
Natural Gas | $58,402 | 7,836 | MMBtu | $7.45 |
TOTAL ENERGY COSTS | $152,664 | |||
RECOMMENDED SAVINGS* | $8,157 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,512 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,021 Cost: $1,180 |
$198 | 5,080 | $32 | 7 | - | - | $791 | - | - | - |
$198 5,080 kWh |
$32 7 kW-months/year |
- - MMBtu |
$791 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $857 Cost: - |
- | - | - | - | - | - | - | - | $857 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$857 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,079 Cost: $2,156 |
$719 | 18,447 | $360 | 77 | - | - | - | - | - | - |
$719 18,447 kWh |
$360 77 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,433 Cost: $252 |
$1,433 | 36,739 | - | - | - | - | - | - | - | - |
$1,433 36,739 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $853 Cost: $822 |
- | - | - | - | $853 | 115 | - | - | - | - |
- - kWh |
- - kW-months/year |
$853 115 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,521 Cost: $472 |
- | - | - | - | $1,521 | 205 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,521 205 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,393 Cost: $758 |
$590 | 15,124 | $296 | 64 | - | - | $507 | - | - | - |
$590 15,124 kWh |
$296 64 kW-months/year |
- - MMBtu |
$507 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,157 Cost: $5,640 |
$2,940 | 75,390 | $688 | 148 | $2,374 | 320 | $1,298 | - | $857 | - | $2,940 75,390 kWh |
$688 148 kW-months/year |
$2,374 320 MMBtu |
$1,298 - $ |
$857 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,512 Cost: $2,408 |
$2,152 | 55,186 | $360 | 77 | - | - | - | - | - | - | $2,152 55,186 kWh |
$360 77 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption |