IAC Assessment: OK0689
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0689
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Large Custom HVAC Units
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 126,000
Annual Production 187 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,871 1,726,020 kWh $0.03
Electricity Demand $27,258 5,845 kW-months/year $4.66
Electricity Fees $13,133 - $ -
Natural Gas $58,402 7,836 MMBtu $7.45
TOTAL ENERGY COSTS $152,664
RECOMMENDED SAVINGS* $8,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,512
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,021
Cost:
$1,180
$198 5,080 $32 7 - - $791 - - - $198
5,080
kWh
$32
7
kW-months/year
-
-
MMBtu
$791
-
$
-
-
Tgal
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$857
Cost:
-
- - - - - - - - $857 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$857
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,079
Cost:
$2,156
$719 18,447 $360 77 - - - - - - $719
18,447
kWh
$360
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,433
Cost:
$252
$1,433 36,739 - - - - - - - - $1,433
36,739
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$853
Cost:
$822
- - - - $853 115 - - - - -
-
kWh
-
-
kW-months/year
$853
115
MMBtu
-
-
$
-
-
Tgal
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,521
Cost:
$472
- - - - $1,521 205 - - - - -
-
kWh
-
-
kW-months/year
$1,521
205
MMBtu
-
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,393
Cost:
$758
$590 15,124 $296 64 - - $507 - - - $590
15,124
kWh
$296
64
kW-months/year
-
-
MMBtu
$507
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$8,157
Cost:
$5,640
$2,940 75,390 $688 148 $2,374 320 $1,298 - $857 - $2,940
75,390
kWh
$688
148
kW-months/year
$2,374
320
MMBtu
$1,298
-
$
$857
-
Tgal
TOTAL IMPLEMENTED Savings:
$2,512
Cost:
$2,408
$2,152 55,186 $360 77 - - - - - - $2,152
55,186
kWh
$360
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption