IAC logo
IAC Assessment: OK0695
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0695
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Pizza Crust
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 48,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,313 3,544,466 kWh $0.03
Electricity Demand $75,406 9,050 kW-months/year $8.33
Electricity Fees $50,366 - $ -
Natural Gas $19,293 2,014 MMBtu $9.58
TOTAL ENERGY COSTS $259,074
RECOMMENDED SAVINGS* $91,295 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,553
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$35,493
Cost:
$329,564
$35,493 553,718 - - - - - - - - - - - - $35,493
553,718
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,436
Cost:
$17,500
- - - - - - $17,436 1,820 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$17,436
1,820
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,386
Cost:
$4,515
$1,386 48,444 - - - - - - - - - - - - $1,386
48,444
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$10,723
Cost:
$21,750
$10,723 374,912 - - - - - - - - - - - - $10,723
374,912
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$2,354
Cost:
$2,546
- - - - $1,612 - - - - - $742 - - - -
-
kWh
-
-
kW-months/year
$1,612
-
$
-
-
MMBtu
-
-
$
$742
-
$
-
-
$
06: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$6,830
Cost:
-
- - - - - - - - $6,830 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,830
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,073
Cost:
$23,985
$11,472 178,963 $4,296 516 - - - - $4,950 - - - $(-3,645) - $11,472
178,963
kWh
$4,296
516
kW-months/year
-
-
$
-
-
MMBtu
$4,950
-
$
-
-
$
$(-3,645)
-
$
TOTAL RECOMMENDED Savings:
$91,295
Cost:
$399,860
$59,074 1,156,037 $4,296 516 $1,612 - $17,436 1,820 $11,780 - $742 - $(-3,645) - $59,074
1,156,037
kWh
$4,296
516
kW-months/year
$1,612
-
$
$17,436
1,820
MMBtu
$11,780
-
$
$742
-
$
$(-3,645)
-
$
TOTAL IMPLEMENTED Savings:
$17,553
Cost:
$21,750
$10,723 374,912 - - - - - - $6,830 - - - - - $10,723
374,912
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,830
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost