IAC Assessment: OK0698
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0698
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Plastic Products
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales n/a
# of Employees 300
Plant Area (Sq.Ft.) 400,000
Annual Production 33,700,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $278,739 11,552,800 kWh $0.02
Electricity Demand $201,222 20,720 kW-months/year $9.71
Natural Gas $37,333 6,540 MMBtu $5.71
TOTAL ENERGY COSTS $532,583
RECOMMENDED SAVINGS* $73,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,996
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,375
Cost:
$9,750
$7,375 306,032 - - - - - - - - - - $7,375
306,032
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,579
Cost:
$887
$3,598 149,310 $1,981 17 - - - - - - - - $3,598
149,310
kWh
$1,981
17
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,540
Cost:
$32,000
$11,540 478,804 - - - - - - - - - - $11,540
478,804
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,315
Cost:
$8,500
- - $16,315 140 - - - - - - - - -
-
kWh
$16,315
140
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,955
Cost:
$150
$914 37,913 - - $4,041 708 - - - - - - $914
37,913
kWh
-
-
kW-months/year
$4,041
708
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,656
Cost:
$50,065
$10,656 442,175 - - - - - - - - - - $10,656
442,175
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,200
Cost:
-
- - - - - - - - $5,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,200
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$391
Cost:
$804
$391 16,224 - - - - - - - - - - $391
16,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,550
Cost:
$60
- - - - - - $2,550 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,550
-
Tgal
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,196
Cost:
$360
$963 39,946 $531 5 - - - - - - $702 - $963
39,946
kWh
$531
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$702
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$567
Cost:
$1,377
$184 7,621 $101 1 - - - - $282 - - - $184
7,621
kWh
$101
1
kW-months/year
-
-
MMBtu
-
-
Tgal
$282
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,719
Cost:
$16,878
$1,111 46,085 $613 5 - - - - $3,995 - - - $1,111
46,085
kWh
$613
5
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,995
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,043
Cost:
$120,831
$36,732 1,524,110 $19,541 168 $4,041 708 $2,550 - $9,477 - $702 - $36,732
1,524,110
kWh
$19,541
168
kW-months/year
$4,041
708
MMBtu
$2,550
-
Tgal
$9,477
-
$
$702
-
$
TOTAL IMPLEMENTED Savings:
$28,996
Cost:
$51,946
$16,824 698,044 $2,695 23 - - - - $9,477 - - - $16,824
698,044
kWh
$2,695
23
kW-months/year
-
-
MMBtu
-
-
Tgal
$9,477
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material