IAC logo
IAC Assessment: OK0699
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0699
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2004
Principal Product Wiring Harnesses
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 123
Plant Area (Sq.Ft.) 55,000
Annual Production 14,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,759 710,054 kWh $0.03
Electricity Demand $26,776 2,759 kW-months/year $9.70
Natural Gas $18,649 2,464 MMBtu $7.57
TOTAL ENERGY COSTS $69,850
RECOMMENDED SAVINGS* $38,512 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,512
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$9,780
Cost:
$6,150
$680 22,233 - - - - $9,100 - - - $680
22,233
kWh
-
-
kW-months/year
-
-
MMBtu
$9,100
-
$
-
-
$
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$8,145
Cost:
$24,175
$4,832 157,918 $3,313 341 - - - - - - $4,832
157,918
kWh
$3,313
341
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$5,446
Cost:
$23,400
$5,446 177,986 - - - - - - - - $5,446
177,986
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,440
Cost:
$18,681
$1,216 39,728 $2,224 229 - - - - - - $1,216
39,728
kWh
$2,224
229
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$6,489
Cost:
$3,960
- - - - $6,489 871 - - - - -
-
kWh
-
-
kW-months/year
$6,489
871
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$418
Cost:
$520
$418 13,645 - - - - - - - - $418
13,645
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$324
Cost:
$707
$117 3,810 $51 5 - - - - $156 - $117
3,810
kWh
$51
5
kW-months/year
-
-
MMBtu
-
-
$
$156
-
$
08: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$4,470
Cost:
-
- - - - $4,470 600 - - - - -
-
kWh
-
-
kW-months/year
$4,470
600
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,512
Cost:
$77,593
$12,709 415,320 $5,588 575 $10,959 1,471 $9,100 - $156 - $12,709
415,320
kWh
$5,588
575
kW-months/year
$10,959
1,471
MMBtu
$9,100
-
$
$156
-
$
TOTAL IMPLEMENTED Savings:
$38,512
Cost:
$77,593
$12,709 415,320 $5,588 575 $10,959 1,471 $9,100 - $156 - $12,709
415,320
kWh
$5,588
575
kW-months/year
$10,959
1,471
MMBtu
$9,100
-
$
$156
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost