IAC Assessment: OK0703
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0703
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Plastic Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 800,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $932,608 32,536,452 kWh $0.03
Electricity Demand $334,367 55,746 kW-months/year $6.00
Electricity Fees $5,460 - $ -
Natural Gas $50,262 6,817 MMBtu $7.37
TOTAL ENERGY COSTS $1,322,697
RECOMMENDED SAVINGS* $187,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,862
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$37,468
Cost:
$34,300
$37,468 1,305,510 - - - - $37,468
1,305,510
kWh
-
-
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,044
Cost:
$25,020
$7,044 245,462 - - - - $7,044
245,462
kWh
-
-
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$36,596
Cost:
$39,180
$36,596 1,275,134 - - - - $36,596
1,275,134
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,659
Cost:
$1,739
$53,659 1,372,341 - - - - $53,659
1,372,341
kWh
-
-
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,204
Cost:
$1,727
$16,484 574,380 $4,720 787 - - $16,484
574,380
kWh
$4,720
787
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,018
Cost:
$22,540
$7,011 244,277 $2,007 335 - - $7,011
244,277
kWh
$2,007
335
kW-months/year
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,250
Cost:
-
- - - - $1,250 - -
-
kWh
-
-
kW-months/year
$1,250
-
$
08: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$21,564
Cost:
$1,025
- - $21,564 3,600 - - -
-
kWh
$21,564
3,600
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$187,803
Cost:
$125,531
$158,262 5,017,104 $28,291 4,722 $1,250 - $158,262
5,017,104
kWh
$28,291
4,722
kW-months/year
$1,250
-
$
TOTAL IMPLEMENTED Savings:
$73,862
Cost:
$88,467
$67,135 2,339,253 $6,727 1,122 - - $67,135
2,339,253
kWh
$6,727
1,122
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes