IAC logo
IAC Assessment: OK0707
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0707
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Custom Printed Envelopes
NAICS 322230 - Stationery Product Manufacturing
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 50,000
Annual Production 850,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,632 4,717,884 kWh $0.03
Electricity Demand $41,691 10,182 kW-months/year $4.09
Electricity Fees $67,489 - $ -
Natural Gas $15,588 1,524 MMBtu $10.23
TOTAL ENERGY COSTS $286,628
RECOMMENDED SAVINGS* $23,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,210
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$4,316
Cost:
$7,739
$590 12,309 $106 26 $620 63 $3,000 - $590
12,309
kWh
$106
26
kW-months/year
$620
63
MMBtu
$3,000
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,571
Cost:
$25,675
- - - - $5,571 562 - - -
-
kWh
-
-
kW-months/year
$5,571
562
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,532
Cost:
$1,380
- - - - $4,532 457 - - -
-
kWh
-
-
kW-months/year
$4,532
457
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,916
Cost:
$617
$4,437 92,638 $729 178 - - $(-250) - $4,437
92,638
kWh
$729
178
kW-months/year
-
-
MMBtu
$(-250)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,639
Cost:
$6,750
$2,201 45,906 $438 107 - - - - $2,201
45,906
kWh
$438
107
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,173
Cost:
$6,405
- - $1,173 168 - - - - -
-
kWh
$1,173
168
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$594
Cost:
$626
$594 12,397 - - - - - - $594
12,397
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,741
Cost:
$49,192
$7,822 163,250 $2,446 479 $10,723 1,082 $2,750 - $7,822
163,250
kWh
$2,446
479
kW-months/year
$10,723
1,082
MMBtu
$2,750
-
$
TOTAL IMPLEMENTED Savings:
$8,210
Cost:
$32,425
$2,201 45,906 $438 107 $5,571 562 - - $2,201
45,906
kWh
$438
107
kW-months/year
$5,571
562
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes