IAC Assessment: OK0712
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0712
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Plastics Injection Molding
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 350,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,003,807 42,282,000 kWh $0.02
Electricity Demand $394,269 66,543 kW-months/year $5.93
Electricity Fees $431,845 - $ -
Natural Gas $28,274 2,815 MMBtu $10.04
TOTAL ENERGY COSTS $1,938,435
RECOMMENDED SAVINGS* $117,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,981
Cost:
$11,356
$4,016 118,936 $965 163 - - - - - - - - $4,016
118,936
kWh
$965
163
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,669
Cost:
$7,920
$20,669 612,064 - - - - - - - - - - $20,669
612,064
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,357
Cost:
$23,560
$9,357 277,067 - - - - - - - - - - $9,357
277,067
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$672
Cost:
$1,820
$672 19,885 - - - - - - - - - - $672
19,885
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,800
Cost:
$5,000
$14,351 424,948 $3,449 49 - - - - - - - - $14,351
424,948
kWh
$3,449
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$39,487
Cost:
$48,800
$39,487 916,178 - - - - - - - - - - $39,487
916,178
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,142
Cost:
$860
$166 4,906 $40 1 - - $936 - - - - - $166
4,906
kWh
$40
1
kW-months/year
-
-
MMBtu
$936
-
$
-
-
$
-
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,000
Cost:
$3,000
- - - - - - - - - - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$4,000
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,026
Cost:
$3,377
$464 13,732 $562 65 - - - - - - - - $464
13,732
kWh
$562
65
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,512
Cost:
$660
- - - - $1,512 155 - - - - - - -
-
kWh
-
-
kW-months/year
$1,512
155
MMBtu
-
-
$
-
-
$
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,871
Cost:
$1,327
$7,293 215,955 $1,778 300 - - $(-200) - - - - - $7,293
215,955
kWh
$1,778
300
kW-months/year
-
-
MMBtu
$(-200)
-
$
-
-
$
-
-
$
12: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$7,801
Cost:
-
- - - - - - - - $7,801 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$7,801
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$117,318
Cost:
$107,680
$96,475 2,603,671 $6,794 578 $1,512 155 $736 - $7,801 - $4,000 - $96,475
2,603,671
kWh
$6,794
578
kW-months/year
$1,512
155
MMBtu
$736
-
$
$7,801
-
$
$4,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes One-time Revenue or Avoided Cost