IAC Assessment: OK0713
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0713
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Canned fruit juice and drinks
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 269
Plant Area (Sq.Ft.) 465,000
Annual Production 227,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $514,592 14,496,128 kWh $0.04
Electricity Demand $229,215 27,343 kW-months/year $8.38
Electricity Fees $35,707 - $ -
Natural Gas $926,610 150,982 MMBtu $6.14
TOTAL ENERGY COSTS $1,724,124
RECOMMENDED SAVINGS* $196,858 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $161,012
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$81,171
Cost:
$1,436
- - - - $81,171 13,269 - - - - -
-
kWh
-
-
kW-months/year
$81,171
13,269
MMBtu
-
-
$
-
-
%
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$26,495
Cost:
$85,051
- - - - $26,495 4,315 - - - - -
-
kWh
-
-
kW-months/year
$26,495
4,315
MMBtu
-
-
$
-
-
%
03: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$5,346
Cost:
$35
$4,037 113,743 $1,309 156 - - - - - - $4,037
113,743
kWh
$1,309
156
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
04: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$48,000
Cost:
$35
- - - - - - - - $48,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$48,000
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,796
Cost:
$139,341
$34,604 974,778 $11,162 1,332 - - $(-11,970) - - - $34,604
974,778
kWh
$11,162
1,332
kW-months/year
-
-
MMBtu
$(-11,970)
-
$
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,489
Cost:
$3,283
$305 8,585 $99 12 - - $1,085 - - - $305
8,585
kWh
$99
12
kW-months/year
-
-
MMBtu
$1,085
-
$
-
-
%
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$561
Cost:
$975
$561 15,808 - - - - - - - - $561
15,808
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$196,858
Cost:
$230,156
$39,507 1,112,914 $12,570 1,500 $107,666 17,584 $(-10,885) - $48,000 - $39,507
1,112,914
kWh
$12,570
1,500
kW-months/year
$107,666
17,584
MMBtu
$(-10,885)
-
$
$48,000
-
%
TOTAL IMPLEMENTED Savings:
$161,012
Cost:
$86,557
$4,037 113,743 $1,309 156 $107,666 17,584 - - $48,000 - $4,037
113,743
kWh
$1,309
156
kW-months/year
$107,666
17,584
MMBtu
-
-
$
$48,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Increase in Production