Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2005
Principal Product Commercial aggregate
NAICS 327991 - Cut Stone and Stone Product Manufacturing
SIC 3281 - Cut Stone And Stone Products
Sales $1,000,000-$5,000,000
# of Employees 31
Plant Area (Sq.Ft.) 1,000,000
Annual Production 1,900,000 Tons
Production Hrs. Annual 5,824
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,173 5,511,600 kWh $0.03
Electricity Demand $158,115 23,302 kW-months/year $6.79
Electricity Fees $(-31,658) - $ -
TOTAL ENERGY COSTS $317,630
RECOMMENDED SAVINGS* $(-13,244) *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ %
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,863
Cost:
$38,544
- - $10,863 1,908 - - - - - - - - -
-
kWh
$10,863
1,908
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,900
Cost:
$200
- - - - - - $1,900 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,900
-
$
-
-
$
-
-
%
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$(-28,676)
Cost:
-
$(-15,087) (-434,785) - - $(-13,599) (-806) - - - - $10 - $(-15,087)
(-434,785)
kWh
-
-
kW-months/year
$(-13,599)
(-806)
MMBtu
-
-
$
-
-
$
$10
-
%
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,725
Cost:
$125
$1,041 30,000 $684 120 - - - - - - - - $1,041
30,000
kWh
$684
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$212
Cost:
$475
$212 6,124 - - - - - - - - - - $212
6,124
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$579
Cost:
$25
$579 16,697 - - - - - - - - - - $579
16,697
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$153
Cost:
$1,346
$92 2,662 $70 12 - - - - $(-9) - - - $92
2,662
kWh
$70
12
kW-months/year
-
-
MMBtu
-
-
$
$(-9)
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$(-13,244)
Cost:
$40,715
$(-13,163) (-379,302) $11,617 2,040 $(-13,599) (-806) $1,900 - $(-9) - $10 - $(-13,163)
(-379,302)
kWh
$11,617
2,040
kW-months/year
$(-13,599)
(-806)
MMBtu
$1,900
-
$
$(-9)
-
$
$10
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ %
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Increase in Production