Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2005 |
Principal Product | Derivatives of guar gum |
NAICS | 325194 - Cyclic Crude, Intermediate, and Gum and Wood Chemical Manufacturing |
SIC | 2861 - Gum And Wood Chemicals |
Sales | $10,000,000-$50,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 28,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,289,538 | 21,211,936 | kWh | $0.06 |
Electricity Demand | $140,806 | - | kW-months/year | - |
Electricity Fees | $38,635 | - | $ | - |
Natural Gas | $997,942 | 141,963 | MMBtu | $7.03 |
TOTAL ENERGY COSTS | $2,569,921 | |||
RECOMMENDED SAVINGS* | $55,238 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,701 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $12,970 Cost: $500 |
$12,141 | 199,035 | $829 | 274 | - | - | - | - |
$12,141 199,035 kWh |
$829 274 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $13,021 Cost: $40,875 |
$13,021 | 213,467 | - | - | - | - | - | - |
$13,021 213,467 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $5,034 Cost: $459 |
$4,713 | 77,263 | $321 | 106 | - | - | - | - |
$4,713 77,263 kWh |
$321 106 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,239 Cost: $8,030 |
- | - | - | - | $4,239 | 603 | - | - |
- - kWh |
- - kW-months/year |
$4,239 603 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $2,243 Cost: $5,175 |
- | - | - | - | $2,243 | 319 | - | - |
- - kWh |
- - kW-months/year |
$2,243 319 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,343 Cost: $1,693 |
- | - | - | - | $1,343 | 191 | - | - |
- - kWh |
- - kW-months/year |
$1,343 191 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,162 Cost: $1,710 |
- | - | - | - | $2,162 | 308 | - | - |
- - kWh |
- - kW-months/year |
$2,162 308 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,226 Cost: $66,500 |
$10,340 | 169,506 | $704 | 232 | - | - | $3,182 | - |
$10,340 169,506 kWh |
$704 232 kW-months/year |
- - MMBtu |
$3,182 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,238 Cost: $124,942 |
$40,215 | 659,271 | $1,854 | 612 | $9,987 | 1,421 | $3,182 | - | $40,215 659,271 kWh |
$1,854 612 kW-months/year |
$9,987 1,421 MMBtu |
$3,182 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,701 Cost: $70,403 |
$22,481 | 368,541 | $1,533 | 506 | $3,505 | 499 | $3,182 | - | $22,481 368,541 kWh |
$1,533 506 kW-months/year |
$3,505 499 MMBtu |
$3,182 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |