IAC logo
IAC Assessment: OK0720
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0720
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Powder Coated Parts
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 28
Plant Area (Sq.Ft.) 50,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,440 688,380 kWh $0.08
Natural Gas $126,696 16,196 MMBtu $7.82
TOTAL ENERGY COSTS $180,136
RECOMMENDED SAVINGS* $39,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,523
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$10,475
Cost:
$1,000
- - - - $10,475 1,339 - - - - - - -
-
kWh
-
-
kW-months/year
$10,475
1,339
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,780
Cost:
$4,636
- - - - $10,780 1,378 - - - - - - -
-
kWh
-
-
kW-months/year
$10,780
1,378
MMBtu
-
-
$
-
-
$
-
-
$
03: 3.2176 INCREASE USE OF AUTOMATION Savings:
$10,975
Cost:
$6,000
$463 17,456 - - - - - - $10,512 - - - $463
17,456
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$10,512
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$786
Cost:
$5,290
$256 9,651 $388 4 - - $142 - - - - - $256
9,651
kWh
$388
4
kW-months/year
-
-
MMBtu
$142
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,282
Cost:
$9,940
$655 24,700 $931 10 - - $(-304) - - - - - $655
24,700
kWh
$931
10
kW-months/year
-
-
MMBtu
$(-304)
-
$
-
-
$
-
-
$
06: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$5,200
Cost:
-
- - - - - - - - - - $5,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$5,200
-
$
TOTAL RECOMMENDED Savings:
$39,498
Cost:
$26,866
$1,374 51,807 $1,319 14 $21,255 2,717 $(-162) - $10,512 - $5,200 - $1,374
51,807
kWh
$1,319
14
kW-months/year
$21,255
2,717
MMBtu
$(-162)
-
$
$10,512
-
$
$5,200
-
$
TOTAL IMPLEMENTED Savings:
$28,523
Cost:
$20,866
$911 34,351 $1,319 14 $21,255 2,717 $(-162) - - - $5,200 - $911
34,351
kWh
$1,319
14
kW-months/year
$21,255
2,717
MMBtu
$(-162)
-
$
-
-
$
$5,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material One-time Revenue or Avoided Cost