IAC logo
IAC Assessment: OK0723
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0723
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Metal Plating
NAICS 332811 - Metal Heat Treating
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 70,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) OK
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,576 6,071,609 kWh $0.05
Electricity Demand $77,096 16,966 kW-months/year $4.54
Electricity Fees $5,303 - $ -
Natural Gas $200,899 32,308 MMBtu $6.22
TOTAL ENERGY COSTS $640,327
RECOMMENDED SAVINGS* $86,383 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,238
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$23,600
Cost:
$18,000
- - - - $23,600 3,077 - - -
-
kWh
-
-
kW-months/year
$23,600
3,077
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,849
Cost:
$10,033
- - - - $7,849 1,023 - - -
-
kWh
-
-
kW-months/year
$7,849
1,023
MMBtu
-
-
$
03: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$1,135
Cost:
$587
- - - - $1,135 148 - - -
-
kWh
-
-
kW-months/year
$1,135
148
MMBtu
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,065
Cost:
$2,539
- - - - $1,065 139 - - -
-
kWh
-
-
kW-months/year
$1,065
139
MMBtu
-
-
$
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,531
Cost:
$5,250
- - - - $3,531 460 - - -
-
kWh
-
-
kW-months/year
$3,531
460
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,876
Cost:
$17,879
$13,876 221,654 - - - - - - $13,876
221,654
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,395
Cost:
$7,192
$8,395 149,174 - - - - - - $8,395
149,174
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,096
Cost:
$42,002
$23,096 368,945 - - - - - - $23,096
368,945
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,836
Cost:
$9,913
$3,577 73,008 $531 117 - - $(-272) - $3,577
73,008
kWh
$531
117
kW-months/year
-
-
MMBtu
$(-272)
-
$
TOTAL RECOMMENDED Savings:
$86,383
Cost:
$113,395
$48,944 812,781 $531 117 $37,180 4,847 $(-272) - $48,944
812,781
kWh
$531
117
kW-months/year
$37,180
4,847
MMBtu
$(-272)
-
$
TOTAL IMPLEMENTED Savings:
$65,238
Cost:
$83,718
$36,972 590,599 - - $28,266 3,685 - - $36,972
590,599