IAC logo
IAC Assessment: OK0727
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0727
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Salts for livestock and water treatment
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 52,325
Annual Production 120,000 Tons
Production Hrs. Annual 5,200
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,251 3,420,600 kWh $0.06
Natural Gas $316,916 29,980 MMBtu $10.57
TOTAL ENERGY COSTS $528,167
RECOMMENDED SAVINGS* $163,688 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,766
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,431
Cost:
$2,462
$4,035 72,307 $396 14 - - - - - - $4,035
72,307
kWh
$396
14
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,646
Cost:
$75
- - - - - - $1,646 156 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,646
156
MMBtu
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,463
Cost:
$40,452
$10,476 187,745 - - - - $1,987 188 - - $10,476
187,745
kWh
-
-
kW-months/year
-
-
$
$1,987
188
MMBtu
-
-
$
04: 2.5124 USE GRAVITY FEEDS WHEREVER POSSIBLE Savings:
$10,056
Cost:
$1,636
$10,342 185,340 $1,014 36 - - - - $(-1,300) - $10,342
185,340
kWh
$1,014
36
kW-months/year
-
-
$
-
-
MMBtu
$(-1,300)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,960
Cost:
$8,407
$1,725 30,910 $235 8 - - - - - - $1,725
30,910
kWh
$235
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$117,767
Cost:
$838,833
- - - - $117,767 - - - - - -
-
kWh
-
-
kW-months/year
$117,767
-
$
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,689
Cost:
$7,635
- - - - - - $14,689 1,390 - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,689
1,390
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$676
Cost:
$535
$676 12,106 - - - - - - - - $676
12,106
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$163,688
Cost:
$900,035
$27,254 488,408 $1,645 58 $117,767 - $18,322 1,734 $(-1,300) - $27,254
488,408
kWh
$1,645
58
kW-months/year
$117,767
-
$
$18,322
1,734
MMBtu
$(-1,300)
-
$
TOTAL IMPLEMENTED Savings:
$20,766
Cost:
$10,172
$4,035 72,307 $396 14 - - $16,335 1,546 - - $4,035
72,307
kWh
$396
14
kW-months/year
-
-
$
$16,335
1,546
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes