IAC logo
IAC Assessment: OK0729
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0729
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Milk Products
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 50,000
Annual Production 170,000 Pounds
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,713 7,849,200 kWh $0.03
Electricity Demand $122,006 14,635 kW-months/year $8.34
Natural Gas $136,403 15,162 MMBtu $9.00
TOTAL ENERGY COSTS $471,122
RECOMMENDED SAVINGS* $19,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$9,248
Cost:
$15,150
- - - - $9,248 1,028 -
-
kWh
-
-
kW-months/year
$9,248
1,028
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,516
Cost:
$4,800
$1,516 35,755 - - - - $1,516
35,755
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,820
Cost:
$3,090
$2,820 66,499 - - - - $2,820
66,499
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,968
Cost:
$18,960
$1,711 40,350 $1,257 156 - - $1,711
40,350
kWh
$1,257
156
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,965
Cost:
$3,244
- - - - $2,965 330 -
-
kWh
-
-
kW-months/year
$2,965
330
MMBtu
TOTAL RECOMMENDED Savings:
$19,517
Cost:
$45,244
$6,047 142,604 $1,257 156 $12,213 1,358 $6,047
142,604
kWh
$1,257
156
kW-months/year
$12,213
1,358
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas