IAC Assessment: OK0730
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0730
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Ferrous Castings
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 30,000
Annual Production 1,500,000 Pounds
Production Hrs. Annual 2,860
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,645 2,262,600 kWh $0.07
Natural Gas $98,463 10,403 MMBtu $9.46
TOTAL ENERGY COSTS $266,768
RECOMMENDED SAVINGS* $40,421 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,069
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$26,839
Cost:
$1,000
- - $26,839 - - - -
-
kWh
$26,839
-
$
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,500
Cost:
$1,237
- - - - $1,500 158 -
-
kWh
-
-
$
$1,500
158
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,533
Cost:
$3,500
$5,533 74,675 - - - - $5,533
74,675
kWh
-
-
$
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$948
Cost:
$158
$948 12,790 - - - - $948
12,790
kWh
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$150
Cost:
$767
$150 1,883 - - - - $150
1,883
kWh
-
-
$
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,565
Cost:
$8,601
- - - - $1,565 165 -
-
kWh
-
-
$
$1,565
165
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,886
Cost:
$1,767
$3,886 55,132 - - - - $3,886
55,132
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$40,421
Cost:
$17,030
$10,517 144,480 $26,839 - $3,065 323 $10,517
144,480
kWh
$26,839
-
$
$3,065
323
MMBtu
TOTAL IMPLEMENTED Savings:
$11,069
Cost:
$7,271
$9,569 131,690 - - $1,500 158 $9,569
131,690
kWh
-
-
$
$1,500
158
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas