IAC Assessment: OK0732
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0732
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2006
Principal Product Paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 106,000
Annual Production 1,000,000,000 Units
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,175 3,960,000 kWh $0.03
Electricity Demand $105,048 10,672 kW-months/year $9.84
Natural Gas $313,376 41,772 MMBtu $7.50
TOTAL ENERGY COSTS $538,599
RECOMMENDED SAVINGS* $54,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,137
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,149
Cost:
$2,491
$4,149 72,917 - - - - $4,149
72,917
kWh
-
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,061
Cost:
$32,500
- - $23,061 - - - -
-
kWh
$23,061
-
$
-
-
MMBtu
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$18,843
Cost:
$17,500
- - - - $18,843 2,612 -
-
kWh
-
-
$
$18,843
2,612
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,602
Cost:
$1,223
- - - - $1,602 222 -
-
kWh
-
-
$
$1,602
222
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,800
Cost:
$1,241
$1,800 6,658 - - - - $1,800
6,658
kWh
-
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,627
Cost:
$3,627
$3,627 18,720 - - - - $3,627
18,720
kWh
-
-
$
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$685
Cost:
$685
$685 7,030 - - - - $685
7,030
kWh
-
-
$
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,116
Cost:
$1,065
$1,116 19,620 - - - - $1,116
19,620
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$54,883
Cost:
$60,332
$11,377 124,945 $23,061 - $20,445 2,834 $11,377
124,945
kWh
$23,061
-
$
$20,445
2,834
MMBtu
TOTAL IMPLEMENTED Savings:
$31,137
Cost:
$27,147
$10,692 117,915 - - $20,445 2,834 $10,692
117,915
kWh
-
-
$
$20,445
2,834
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas