IAC logo
IAC Assessment: OK0750
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0750
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2007
Principal Product Commercial printing
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2754 - Commercial Printing, Gravure
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 90,000
Annual Production 50,000,000 Units
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,724 2,320,800 kWh $0.07
Electricity Fees $4,810 - $ -
Natural Gas $91,591 11,879 MMBtu $7.71
TOTAL ENERGY COSTS $259,671
RECOMMENDED SAVINGS* $4,183,678 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Increase in Production Electricity Usage Natural Gas Increase in Production
$ kWh $ MMBtu $ %
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,319
Cost:
$1,100
$6,319 90,277 - - - - $6,319
90,277
kWh
-
-
MMBtu
-
-
%
02: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,776
Cost:
$8,988
$1,776 25,371 - - - - $1,776
25,371
kWh
-
-
MMBtu
-
-
%
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$1,091
Cost:
$4,248
$1,091 15,586 - - - - $1,091
15,586
kWh
-
-
MMBtu
-
-
%
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$8,272
Cost:
$16,000
$8,272 118,171 - - - - $8,272
118,171
kWh
-
-
MMBtu
-
-
%
05: 2.7145 INSTALL SKYLIGHTS Savings:
$5,428
Cost:
$33,634
$5,428 77,543 - - - - $5,428
77,543
kWh
-
-
MMBtu
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,311
Cost:
$7,391
$3,311 58,254 - - - - $3,311
58,254
kWh
-
-
MMBtu
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,081
Cost:
$5,998
$3,081 44,010 - - - - $3,081
44,010
kWh
-
-
MMBtu
-
-
%
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,525
Cost:
$1,000
$2,525 68,220 - - - - $2,525
68,220
kWh
-
-
MMBtu
-
-
%
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,287
Cost:
$6,522
$1,287 18,380 - - - - $1,287
18,380
kWh
-
-
MMBtu
-
-
%
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$4,150,588
Cost:
$195,000
$(-167,327) (-2,390,387) $62,775 8,100 $4,255,140 - $(-167,327)
(-2,390,387)
kWh
$62,775
8,100
MMBtu
$4,255,140
-
%
TOTAL RECOMMENDED Savings:
$4,183,678
Cost:
$279,881
$(-134,237) (-1,874,575) $62,775 8,100 $4,255,140 - $(-134,237)
(-1,874,575)
kWh
$62,775
8,100
MMBtu
$4,255,140
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ MMBtu $ %
Electricity Usage Natural Gas Increase in Production Electricity Usage Natural Gas Increase in Production