IAC logo
IAC Assessment: OK0757
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0757
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2008
Principal Product printing
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales <$500,000
# of Employees 104
Plant Area (Sq.Ft.) 61,000
Annual Production 17,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,927 2,711,400 kWh $0.08
Natural Gas $7,801 669 MMBtu $11.66
TOTAL ENERGY COSTS $226,474
RECOMMENDED SAVINGS* $49,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,747
Cost:
$1,256
$2,747 35,681 - - $2,747
35,681
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,252
Cost:
$7,032
$14,252 185,099 - - $14,252
185,099
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,400
Cost:
$39,500
$17,400 225,969 - - $17,400
225,969
kWh
-
-
MMBtu
04: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$9,419
Cost:
-
$9,419 1,260,000 - - $9,419
1,260,000
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,133
Cost:
$4,638
- - $5,133 375 -
-
kWh
$5,133
375
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$958
Cost:
$1,214
$958 12,439 - - $958
12,439
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$49,909
Cost:
$53,640
$44,776 1,719,188 $5,133 375 $44,776
1,719,188
kWh
$5,133
375
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas