Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2008 |
Principal Product | Marine Propulsion Stern Drives |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3519 - Internal Combustion Engines, Nec |
Sales | >$500,000,000 |
# of Employees | 1,000 |
Plant Area (Sq.Ft.) | 700,000 |
Annual Production | 75,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,299,341 | 45,665,000 | kWh | $0.05 |
Natural Gas | $1,547,495 | 211,838 | MMBtu | $7.31 |
TOTAL ENERGY COSTS | $3,846,836 | |||
RECOMMENDED SAVINGS* | $525,135 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $466,727 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $164,842 Cost: $297,920 |
$164,842 | 3,296,841 | - | - |
$164,842 3,296,841 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7145 INSTALL SKYLIGHTS |
Savings: $14,224 Cost: $54,912 |
$14,224 | 284,482 | - | - |
$14,224 284,482 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $48,433 Cost: $104,000 |
$48,433 | 968,651 | - | - |
$48,433 968,651 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,975 Cost: $8,646 |
$9,975 | 199,496 | - | - |
$9,975 199,496 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $31,605 Cost: $1,000 |
$31,605 | 672,615 | - | - |
$31,605 672,615 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $238,891 Cost: $232,766 |
- | - | $238,891 | 32,680 |
- - kWh |
$238,891 32,680 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $17,165 Cost: - |
$17,165 | 343,309 | - | - |
$17,165 343,309 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $525,135 Cost: $699,244 |
$286,244 | 5,765,394 | $238,891 | 32,680 | $286,244 5,765,394 kWh |
$238,891 32,680 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $466,727 Cost: $586,598 |
$227,836 | 4,597,247 | $238,891 | 32,680 | $227,836 4,597,247 kWh |
$238,891 32,680 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |