IAC Assessment: OK0762
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0762
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2008
Principal Product Marine Propulsion Stern Drives
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3519 - Internal Combustion Engines, Nec
Sales >$500,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 700,000
Annual Production 75,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,299,341 45,665,000 kWh $0.05
Natural Gas $1,547,495 211,838 MMBtu $7.31
TOTAL ENERGY COSTS $3,846,836
RECOMMENDED SAVINGS* $525,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $466,727
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$164,842
Cost:
$297,920
$164,842 3,296,841 - - $164,842
3,296,841
kWh
-
-
MMBtu
02: 2.7145 INSTALL SKYLIGHTS Savings:
$14,224
Cost:
$54,912
$14,224 284,482 - - $14,224
284,482
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$48,433
Cost:
$104,000
$48,433 968,651 - - $48,433
968,651
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,975
Cost:
$8,646
$9,975 199,496 - - $9,975
199,496
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,605
Cost:
$1,000
$31,605 672,615 - - $31,605
672,615
kWh
-
-
MMBtu
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$238,891
Cost:
$232,766
- - $238,891 32,680 -
-
kWh
$238,891
32,680
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$17,165
Cost:
-
$17,165 343,309 - - $17,165
343,309
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$525,135
Cost:
$699,244
$286,244 5,765,394 $238,891 32,680 $286,244
5,765,394
kWh
$238,891
32,680
MMBtu
TOTAL IMPLEMENTED Savings:
$466,727
Cost:
$586,598
$227,836 4,597,247 $238,891 32,680 $227,836
4,597,247
kWh
$238,891
32,680
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas