IAC logo
IAC Assessment: OK0767
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0767
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2008
Principal Product Plastic pipes and Form-A-Drain
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 340,000
Annual Production 8,353,422 Pounds
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,024,219 26,444,450 kWh $0.04
Natural Gas $214,648 22,877 MMBtu $9.38
TOTAL ENERGY COSTS $1,238,867
RECOMMENDED SAVINGS* $177,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,395
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$14,145
Cost:
$1,383
$14,145 1,247 - - $14,145
1,247
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,151
Cost:
$34,635
$14,151 375,804 - - $14,151
375,804
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$803
Cost:
$3,455
$803 16,224 - - $803
16,224
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,640
Cost:
$7,796
$2,640 59,130 - - $2,640
59,130
kWh
-
-
MMBtu
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,068
Cost:
$200
$2,068 - - - $2,068
-
kWh
-
-
MMBtu
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$81,407
Cost:
$117,000
- - $81,407 8,568 -
-
kWh
$81,407
8,568
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$46,431
Cost:
$6,300
- - $46,431 4,950 -
-
kWh
$46,431
4,950
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,751
Cost:
-
$15,751 459,200 - - $15,751
459,200
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$177,396
Cost:
$170,769
$49,558 911,605 $127,838 13,518 $49,558
911,605
kWh
$127,838
13,518
MMBtu
TOTAL IMPLEMENTED Savings:
$78,395
Cost:
$7,883
$31,964 460,447 $46,431 4,950 $31,964
460,447
kWh
$46,431
4,950
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas